*Footage is the total footage of the lot that abuts street <br />right of way. <br />Modification to an approved street tree plan: <br />2. Developer Planting O ion: <br />Development of Street Tree Plan Agreement <br />Tree Establishment: <br />Annual maintenance inspections over <br />three-year establishment period (per year): <br />1-9 trees <br />10+ trees-additional fee per tree <br />Replacement inspection at conclusion of <br />establishment period: <br />1-9 trees <br />10-49 trees <br />50+ trees-additional fee per tree <br />200.00 <br />150.00 <br />1.00 <br />150.00 <br />200.00 <br />1.00 <br />In addition to the above fees, a security bond or cash deposit sufficient to ensure performance under <br />the approved Street Tree Plan shall be provided to the City based on the following formula: <br />a) Measure the total length of lots within or abutting the street right of way in the area <br />being developed. <br />b) Subtract 15 feet for each leg of the vision clearance zone of each intersection <br />included within the development. <br />c) Subtract 30 feet for each residential lot or 80 feet for each commercial or industrial <br />lot within the development (representing future driveways). <br />d) Divide by 30. <br />e) Multiply by 1.10 (representing the 10% anticipated tree mortality). <br />f) Multiply by $300 for local streets or $400 for collector or arterial streets. <br />Trees which fail during the establishment period and are replaced will extend the establishment <br />period an additional three years from the date of the replanting for those trees. <br />The developer may either request the release of the security bond or cash deposit once all trees on <br />the development have completed their establishment period, or annually request the release of the <br />Same as the initial fee <br />Exhibit A - 2 r:\adminord\fees\OOtreefeeexa.wpd(03/14/00) <br />