THIS PAGE PROPOSED <br />2.3 Change of Use <br />When a change of use of an existing development results in an increased impact on the <br />regional wastewater facilities (as demonstrated by calculating the SDC for both uses), the SDC <br />will be charged on the increased impact. This is determined by calculating what the <br />development's charge would be for the current use, and for the proposed use. If the proposed <br />use would result in a higher charge, the difference is collected. <br />2.4 MWMC Wastewater SDC Credit <br />A credit for property taxes on real property paid to retire bonded debt incurred for the <br />construction of regional wastewater facilities shall be deducted from the MWMC wastewater <br />SDC. The credit shall accrue from the year of annexation to the City, and be based upon the <br />assessed value of the real property at the time of application for connection to the system. The <br />current credit is shown in Attachment 3. <br />2.5 MWMC Wastewater Administrative Charge <br />A further adjustment to the MWMC wastewater SDC is the addition of administrative costs. <br />MWMC will incur staff costs for the updating and processing of the charge. These costs are <br />applied on a per connection basis. The MWMC wastewater administrative charge per permit is <br />applied to the total SDC fees after all other charges and credits have been applied. <br />Attachment 3 <br />II Regional (MWMC) Wastewater SDC Credit Rates II <br />For Fiscal Year 2002 Credit, effective Jul 2, 2001 <br />Year of <br />Annexation Credit per $1,000 <br />Assessed Value Year of Annexation Credit per $1,000 <br />Assessed Value <br />1979 $4.92 1990 $2.06 <br />1980 $4.83 1991 ~ 1.64 <br />1981 $4.57 1992 ~ 1.45 <br />1982 $4.64 1993 $1.31 <br />1983 $4.47 1994 $1.13 <br />1984 $4.30 1995 $0.97 <br />1985 $4.09 1996 x$0.82 <br />1986 $3.78 1997 $0.63 <br />1987 $3.41 1998 $0.41 <br />1988 $2.98 1999 X0.22 <br />1989 $2.52 2000 '$0.04 <br />City of Eugene SDC Methodology Wastewater, Page C-11 <br />