New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
Admin Order 58-01-11
COE
>
PW
>
Admin
>
Execs
>
Admin Orders
>
Admin Order 58-01-11
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2009 9:08:48 AM
Creation date
6/2/2009 10:37:11 AM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Administration
PWA_Project_Area
Admin Orders
PW_Subject
SDC
Document_Date
5/22/2001
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
THIS PAGE PROPOSED <br />TABLE 4 <br />Local-Wastewater Systems Development Charge Analysis <br />1. Analysis of System Value <br />Total Replacement Cost -Pipe $380,5979036 <br />Total Replacement Cost -Pumping Stations $14,529,257 <br />City Cost of future projects within UGB $9,097,880 <br />Other Wastewater Com onents $2,982,222 <br />Total Cost of Existing Wastewater System $407,206,394 <br />2. Analysis of Assessable Amount <br />Size Total Cost <br />6-inch $8,647,587 <br />8 to 48-inch $287,757,173 <br />Total Assessable Cost $296,404,760 <br />3. Capacity Information <br />Total City System Capacity 48.9 mgd <br />4. Calculation of Wastewater SDC <br />Total System Valuation, existing and planned $407,206,394 <br />Cost per unit of capacity per gallon $2.07 <br />Residential Rate Structure <br />. $273 per RDU + $0..066 per sq. ft. <br />of living area <br />Non-Residential Rate Structure See Table 4A <br />5. Calculation or Reimbursement Percentage <br />City System Capacity (EDUs) 48.9 mgd 100.00 percent <br />Existing Use 21.4 mgd 43.76 percent <br />Percent Available for New Development 27.5 mgd 56.24 percent <br />Total Value of Reserve Capacity (value of system) $56,943;264 100.00 percent <br />Value of Increased Capacity (cost of future projects in UGB- Master Plan) $9,097,776 15.98 percent <br />Value of Reimbursable Capacity (previously paid value-existing users) $47,845,488 84.02 percent <br />City of Eugene SDC Methodology Wastewater, Page C-4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.