THIS PAGE PROPOSED <br />METHODOLOGY: <br />City of Eugene Systems Development Charges <br />Appendix F <br />Fee Schedule and Formulas <br />1.0 Formula and Calculation Details <br />1.1 General Rate Setting, Cost of Service Formula: <br />SDC eligible :costs <br />= SDC per unit of service <br />Impact Measurement <br />1.2 Transportation System Cost of Service [add cost per trip for: street system ($539.05) <br />+ street system lighting ($138.42) + bicycle path system ($68.66) + bicycle path system <br />lighting ($8.50) =total cost per trip ($754.63]: <br />1.2.1 Street System Cost of Service <br />Formula: <br />-Miles per trip <br />X Cost'per lane mile = Cost per trip <br />Capacity per lane mile <br />Calculation: <br />0.7665 <br />X $474,701. _ $539.05 (per trip) <br />675 <br />1.2.2 Street Light System Cost of Service <br />Formula: <br />Miles per trip <br />X Cost penlight ' = Cost per trip <br />Capacity per lane mile <br />Calculation: <br />0:.7665 <br />X $4,876 = -$138,42 (pertrip) <br />27 <br />City of Eugene SDC Methodology Fee Schedule & Formulas, Page F-1 <br />