TABLE 3 <br />1. Anal sis of Trans ortation S stem <br />Eugene/Springfield metropolitan average vehicle trip length 4.38 <br />Eugene trip end peak vehicle miles; percentage on Eugene's arterial and collector streets 0.35 <br />Total lane miles of arterial and collector system, excluding turn lanes [arterial = 59.4%; collector = 40.6% ] 404.12 <br />Average number of lanes per mile of arterials and collectors 3.26 <br />Eu ene avers a one wa tri len th for arterial and collectors miles er tri 4.38 * 0.35 * %2 0.7665 <br />2. Arterial and Collector Street System Analysis (Linear Mile Costs): <br />Existing level of service "D" for Roads; number of vehicles per hour (capacity per lane mile) 675 <br />Linear Section Total Construction Costs: <br />D Typical collector street width 46 feet D Typical arterial street width" 66 feet <br />D Typical collector construction cost per linear feet $209.19 ~ Typical arterial construction cost per linear feet $299.66 <br />a Total cost per linear mile, 46' collector <br />[ $209.188 * 5,280 linear feet per mile] $1,104,513 D Total cost per linear mile 66' arterial <br />[ $299.265 * 5,280 linear feet per mile] $1,582,194 <br />Average Linear Section Costs: <br />~ Average construction cost per linear mile <br />[ ($1,104,513 *.406) + ($1,582,194 * .594) ] <br />$1,388,256 ~ Average construction cost per linear foot <br />[ $1,388,256 / 5,280 linearfeet per mile] <br />$262.93 <br />D Average non-assessable cost /linear mile [53.9%] $748,270 ~ Average assessable cost /linear mile [46.1 %] $639,986 <br />~ Average non-assessable cost per linear foot <br />[ $748,270 / 5,280 linear feet per mile j $141.72 a Average assessable cost per linear foot <br />[ $639,986 / 5,280 linear feet per mile ] <br />$121.21 <br />Assessable and Non-assessable Costs: <br />a Non-assessable cost per lane mile {excludes <br />administration and engineering charges} <br />[ $748,270 / 3.26 (average # of lanes per mile) ] <br />$229,531 D Assessable cost per lane mile {excludes <br />administration and engineering charges} <br />[ $639,986 / 3.26 (average # of lanes per mile) ] <br />$196,315 <br />a Non-assessable administration/engineering costs <br />applied [ $229,531 * .25 ] <br />$57,383 ~ Assessable administration/engineering costs <br />applied [ $196,315 " .25 ] $49,079 <br />..Tots <br />i. no . <br />..::.c..:.::i~s~.l?)>~: cast..1~?!':laka;kl..~.;:.:;.;>:.::.:<.:. <br /> <br />:~ .: <br />.......:r:::::::: ~ .. <br /> <br />:::.:.. ~::. <br /> <br />::: .::.......~............ <br />.::::::::::::::::::::::::::::. <br /> <br />D Total Assessable Cost er <br />p lane mile <br /> <br />$196,315 49 079 <br /> <br /> <br /> <br />245 393 <br />__ <br />ntersection Costs (based on the linear foot unit costs and the average number of intersections per lane mile): <br />~ Cost per lane mile {excluding administration <br />and engineering costs } <br />$26, 355 <br />___ _ _ - <br />Traffic Signal Costs: <br />D Signalized intersections in Eugene system 144 ~ Total # intersections with traffic signals 198 <br />D Signalized intersections, joint with state system 54 ~ Eugene equivalent signals ((54 / 2) + 144 ] 171 <br />~ Percent signalized intersections per lane mile m Adjusted signalized intersections per lane mile <br />[ 171 / 404.12 ] 0.4231 {with downtown high density reduction factor} 0.35 <br />D <br />Av <br />era <br />e si <br />naliz <br />atio <br />n cost <br />er mt <br />ersec i <br />9 9 p >~;:.>::>::>...f~...ig~ti~a~i~rr;~~s#::i~l~>F~:~s~>E~:;ttf~l~;€f€::s~e~i~(::f:;;::> ;;:;.:;;:;;:> .:..:::;.:..;~:.;:;;: <br />165 000 <br />in <br />clud <br />admim .. 7~tt.: <br />stra io <br />t n& <br />en i e :~:>..: ~ . <br />{ g g charges} ::<:::»::>>~:5-~1~~s!1'e:.;:::;:.;>;:.::.: :<:.: :C:.~1:6:g~ ~ ~6:;~~:.'1 :.>:.::>;~ t::>:::::::<:::>:: <br />Bridges and Other Structure costs: <br />~ Past project costs -small structures, short span bridges {'/z of bridge inventory} $6,483,908 <br />D Past project costs -Ferry St. Bridge and Ferry Street Bridge overpass [ $2,502,958 + $4,274,688 ] $6,777,646 <br />a Administration and engineering costs added to past project costs [ ($6,483,908 + $6,777,646 ) " 0.25 ] $3,315,389 <br />~ Total costs for past projects, bridges and other structures [ $6,483,908 + $6,777,646 + $3,315,389 ] $16,576,943 <br />l Arterial and Collector Street Light Construction Costs: <br />D <br />.,Standard # of.,, ...,-_..^__.. <br />ff _„.street lights per vehicle mile (capacity per lane mile) 27 Cost per arterial street light $4,300 <br />4. Summa of All Trans ortation S stem SDC Com onents: <br />Cost per Street System Component; per trip $597.45 Cost per off-street bicycle path component; per trip $68.05 <br />~.I,:..S[~C..PI~~.TRiP::. eam onel~ts.;inetude::ai .F~~i~n :;~a~sfs::::::::<::»:<:;::>:::;:::::::: ........::<:::>::>:::::<:::»::><::: ~:>..5'~~.~5.~:.:55fl:5:.......~565~~:::: <br />City of Eugene SDC Methodology Transportation, PageB-5 <br />