New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
Admin Order 58-99-16-F-2 (2)
COE
>
PW
>
Admin
>
Execs
>
Admin Orders
>
Admin Order 58-99-16-F-2 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2009 10:45:33 AM
Creation date
6/2/2009 9:31:24 AM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Administration
PWA_Project_Area
Admin Orders
PW_Subject
SDC
Document_Date
10/29/1999
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
2.2 General Method for City of Eugene SDC Rates <br />Table 1 provides an overview of the basis of the rate setting methodology; outlining the basic <br />rates, cost basis, service standards and means of implementation for each system charge. <br />The intent of the methodology is that new development should not be charged for a higher <br />level of service than that currently provided to the community or to which the community has <br />committed future resources. Therefore, additional capacity needs are determined using the <br />City's existing level of service or the City's funded level of service. In a similar manner, new <br />development should be credited for past and future bond payments on infrastructure related <br />existing debt (Metropolitan Wastewater Management Commission [MWMC]) and past trunk <br />sewer levies. <br />City of Eugene SDC Methodology Page 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.