New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
Admin Order 58-98-10-F (2)
COE
>
PW
>
Admin
>
Execs
>
Admin Orders
>
Admin Order 58-98-10-F (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2009 10:38:53 AM
Creation date
6/2/2009 9:11:51 AM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Administration
PWA_Project_Area
Admin Orders
PW_Subject
SDC
Document_Date
5/19/1998
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
EXHIBIT A (page 3 of 6) <br />2.3 Change of Use <br />When a change of use of an existing development results in an increased impact <br />on the regional wastewater facilities (as demonstrated by calculating the SDC for <br />both uses), the SDC will be charged on the increased impact. This is determined <br />by calculating what the development's charge would be for the current use, and for <br />the proposed use. if the proposed use would result in a higher charge, the <br />difference is collected. <br />2.4 MWMC SDC Credit <br />A credit for property taxes on real property paid to retire bonded debt incurred for <br />the construction of regional wastewater facilities shall be deducted from the MWMC <br />SDC. The credit shall accnae from the year of annexation to the City, and be <br />based upon the assessed value of the real property a# the time of application for <br />connection to the system. The current credit is shown in Attachment 4. <br />2.5 MWMC Administrative Charge <br />A further adjustment to the regional wastewater SDC is the addition of <br />administrative costs. MWMC will incur staff costs for the updating and processing <br />of the charge. These costs are applied on a per connection basis. The Regional <br />Wastewater Administrative Charge per permit is applied to the total SDC fees after <br />all other charges and credits have been applied. <br />ATTACHMENT 3 <br />MWMC SDC Credit Table <br /> <br /> For Fiscal Year 1999 Credit, effective Jul 1, 1998 <br /> 'Year of <br />Annexatron'i . Credit per $1,t~0Q <br />Assessed Value "Year of <br /> <br />Ahnexa#~on Credit,per $1,000 <br />`' <br />Assessed Value <br /> 1979 $4.27 1989 $1.98 <br /> 1980 $4.18 1990 $1.55 <br /> 1981 $4. ~ 2 1991 $1.15 <br /> 1982 $3.99 '! 992 $0.96 <br /> 1983 $3.83 1993 $0.83 <br /> 1984. $3.68 1994 $0.67 <br /> 1985 $3.48 1995 $0.52 <br /> 1986 $3.18 .'1996 $0.38 <br /> 1987 $2.82 1997 $0.21 <br /> 1988 $2.42 <br /> <br />City of Eugene SDC Methodology Page D-10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.