t pursue a similar pedestrian-bike bridge requested by the Harlow Neighbors over I-105 <br /> <br /> Neighborhood Capital Requests between I-5 and Coburg Road. <br /> <br /> Following is a compilation and discussion of neighborhood requests for capital projects I Sidewalks for Luella Street north of Bailey Lane: Missing <br /> segments in the City's <br /> <br /> received as part of the current CIP cycle: _ sidewalk network have, in recent years, been addressed by the City Sidewalk Program. <br /> This program identifies and ranks the gaps in the sidewalk system with a focus on <br /> • Laurel Hill Neighborhood Association has requested the completion of a sidewalk on the ~ collector and arterial streets. Sidewalks constructed via this <br /> program are paid for by <br /> east side of Augusta Street extending from E. 26th Avenue to the south end of Laurel Hill individual property owners. At this time the City has no program <br /> for mandating or <br /> Parka Additionally, a short (twenty-foot) segment of paving is requested to complete a ~ encouraging sidewalk construction on low volume local streets <br /> such as Luella. <br /> bicyde/pedestrian connector between Augusta Street and Moon Mountain Drive on the Adding alert-turn only cycle to the signal for westbound traffic turning from <br /> Harlow <br /> north end of the park.. The neighborhood group has been informed that this work will be Road to Palomino: This non-capital request will be evaluated <br /> to determine if <br /> completed with funds from the Park Acquisition levy, recently approved by the appropriate warrants are met. Staff will make any changes <br /> necessary for the safe <br /> community. operation of the existing signal. <br /> • Jefferson Area Neighbors & Westside Neighborhood Quality Project has requested a <br /> safety project to aid pedestrians and bicyclists in crossing West 18th Avenue at Friendly Storm sewer work for Country Lane and Rustic Place -These locations <br /> will be <br /> Street. A project to address this issue is currently being developed. The neighborhood has evaluated to identify any potential rehabilitation/improvement project. <br /> also expressed concerns about how traffic patterns associated with the parking garage Neighborhood leaders Council has requested that the Capital Improvement <br /> Program <br /> (currently under construction on Broadway between Charnelton and Lincoln Streets) may include sufficient funding to complete 25% of the outstanding traffic calming <br /> requests (as <br /> impact nearby residential areas. Staff will be working with the residents of this area to er the Traffic Calmin Re uest List) within 5 ears. Streets <br /> included on the TCRL are <br /> mitigate any. impacts. It is anticipated that any construction associated with either of these p g q y <br /> issues will be funded through the Traffic Operations Improvement Program. ranked requests received to date. Most of these requests have not yet been evaluated <br /> for <br /> any potential solutions, therefore it is difficult to accurately estimate the level of funding <br /> • Harlow Neighbors has submitted a number of requests. The following is a summary and necessary to meet this request. <br /> status of the neighborhood organization's requests: <br /> • A traffic calming project for Bailey and Bogart Lanes: This project ranked at the top of <br /> the Traffic Calming Request°List (TCRL) and was completed this fall. The neighborhood <br /> also reiterated several citizen requests for traffic calming projects on various streets <br /> within the area. Each of°these streets are listed on the TCRL and have been evaluated <br /> and ranked with similar requests on acity-wide basis. <br /> • A Soundwall on the north side of I-105 between Coburg Road and I-5: This project is <br /> proposed. to be constructed vvith funding' from the Oregon Department of <br /> Transportation (ODOT), Lane County, the City of Eugene, and property owner <br /> assessments. Pending final programming of ODOT funds, the city and property owner <br /> funding (approved by the City Council in 1998) is shown in this CIP in FY 2000. <br /> • A pedestrian-bike bridge over I-5 located halfway between Beltline and Harlow Road: <br /> This project is included in the Willakenzie Area Plan and TransPlan and has been <br /> discussed as part of the planning process for a potential ODOT redesign of the Beltline <br /> and I-5 interchange. The TransPlan Update process would be the best approachto r <br /> City of Eugene 2000.2005 Capital Improvement Program City of Eugene 2000.2005 Capital Improvement Program <br /> Overview Overview <br /> 8 9 <br /> <br />