<br /> Wastewater -Two-Year Fund Detail Wastewater -Six-Year Funded Program <br /> Assess Waste Waste Total <br /> FY00 sDC Water <br /> Table of Funded Projects <br /> PreservationlMaintenance (Figures in $tooo's) <br /> Wastewater System Rehabilitation 2000 2000 <br /> 0 0 2000 2000 FY00 FY01 FY02 FY03 FY04 FY05 Total <br /> Preservation/Maintenance <br /> New Capjtal Facjljtjes Wastewater System Rehabilitation 2000 2000 2000 2000 2000 2000 12000 <br /> Deferred Assessments 60 60 <br /> Legacy Interceptor North 270 681 951 2000 2000 2000 2000 2000 2000 12000 <br /> Wastewater Construction Petition Match 115 115 New Capital FaCiljtjes <br /> 270 681 175 1126 Bell Estates Pump Station 315 315 <br /> Coburg Road Wastewater System 355 355 <br /> FY00 Total 270 681 2175 3126 <br /> County Farm Rd Wastewater System (N) 311 311 <br /> Deferred Assessments 60 60 60 60 60 300 <br /> Legacy Interceptor North 951 951 <br /> Assess Waste Waste Total Legacy Interceptor South 2389 2399 <br /> FY01 SDC Water Link Drive Wastewater Pump Station 774 774 <br /> PreservatlOnlMdlntendnce wastewater construction Petition Match 115 115 115 115 115 575 <br /> Wastewater System Rehabilitation 2000 2000 1126 490 2929 949 486 0 5980 <br /> 0 0 2000 2000 tTotal 3126 2490 4929 2949 2486 2000 17980. <br /> New Capital Facilities <br /> Bell Estates Pump Station 315 315 <br /> Deferred Assessments 60 60 tThese totals are not fund-specific and include all programmed funds. For information about specific funds and detailed project <br />funding for <br /> Wastewater Construction Petition Match 115 115 FY2000 and FY2001, refer to the Two Year fund Detail on the previous page(s). <br /> 0 315 175 490 <br /> FY01 Total 0 315 2175 2490 Description of Funded Projects <br /> PreservationlMaintenance <br /> Wastewater System Rehabilitation Preserve and rehabilitate an aging wastewater system and decrease inflow and <br /> infiltration. <br /> Plan(Policy Document: Sanitary Sewer Master Plan, Infiltration-Inflow Program <br /> Total Project Cost: $12,000,000 <br /> New Capital Facilities <br /> Bell Estates Pump Station Construct a pump station to serve future annexed properties north of Bell Estates. <br /> PIanlPolicy Documer~: Sanitary Sewer Master PIan,1992 <br /> Total Project Cost: $315,000 <br /> Coburg Raad Wastewater System Construct a wastewater trunk along Coburg Road to extend service to the north <br /> Willakenzie area. <br /> PIanlPolicy Document: Sanitary Sewer Master Plan, Willakenzie Refinement Plan <br /> Total Project Cost: $355,000 <br /> (Figures in $1000's) <br /> City of Eugene • 2000-2005 Capital Improvement Program City of Eugene • 2000.2005 Capital Improvement Program <br /> Project and Program Areas -Wastewater Project and Program Areas -Wastewater <br /> 55 56 <br /> <br />