New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
FY 2000-05 Eugene CIP Draft
COE
>
PW
>
Admin
>
Execs
>
Executive non-confidential
>
Historical
>
FY 2000-05 Eugene CIP Draft
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/8/2009 12:26:34 PM
Creation date
6/1/2009 12:32:36 PM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Administration
PWA_Project_Area
Miscellaneous
PW_Subject
CIP
Document_Date
11/30/1998
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> Building and Park Facilities -Unfunded Program Building and Park Facilities -Unfunded Program <br /> Communications Tower The Coburg ridge has been identified as the optimal radio site in central Lane County. New West Eugene Fire Station Construct Fire Station <br />to extend coverage in West Eugene. <br /> Additional enhancements to this site will be needed. <br /> PIanlPolicy Document: PlanlPolity Document: LCOG 1998 Fire Station Location Study. <br /> Total Project Cost: $125,000 Total Project Cost: $3,100,000 <br /> DPS Communication Tower Lease land, complete necessary site improvements, and construct communication Parking Structure Construction Construct a new facility to support <br />parking demand from redevelopment of the west <br /> tower for public safety communications. end of the downtown mall and/or development of the Broadway and Chamelton site. <br /> PlanlPolicy Document: Public Safety Long Range Plan PlanlPolity Document: CATS <br /> Total Project Cost: $200,000 Total Project Cost: $5,000,000 <br /> Emergency Vehicle Obstacle Course Construct an emergency vehicle obstacle course (in cooperation with other County Public Safety Station Location and aquisition of <br />a building to house a public safety station and adjacent <br /> public safety agencies) for police, fire, paramedic and other City staff to develop safe parking lot. Lease land, complete necessary site improvement and construction. <br /> driving skills under a variety of road conditions, and for regional driver training of Plan(Polity Document: Public Safety Long Range Plan <br /> personnel from other public agencies. <br /> PlanlPolicy Document: Public Safety Long Range Plan, David N. Burks Regional Total Project Cost: $275,000 <br /> Public Safety Training Facility Master Plan, Airport Mazter <br /> Plan River House Replacemer~ Replace River House outdoor facility due to age as well as structural and code <br /> Total Project Cost: $2,100,000 problems, either on existing site or on another location. New facility will include <br /> program, office and parking space. <br /> PIanlPolicy Document: Facilities Condition Report <br /> Fut W. Eug Fire Station Land Acquisition Purchase land in the west Eugene area to extend coverage. <br /> Total Project Cost: $550,000 <br /> PIanlPolicy Documerrt: LCOG's 1998 Fire Station Location Study <br /> Total Project Cost: $550,000 <br /> Southeast Maintenance Facility Purchase land and former 4J bus facility (located at Amazon Parkway and 20th <br /> Avenue) for storage of materials and equipment to increase the efficiency of <br /> Future NW fire Station land Acquisition Purchase land in the northwest area for future use az a fire station to extend coverage maintenance activities in southeast <br />Eugene, particularly during snow storms. <br /> by 2010. PlanlPolicy Document: <br /> PIanlPolicy Document: LCOG's 1998 Fire Station Location Study Total Project Cost: $225,000 <br /> Total Project Cost: $550,000 <br /> Storage Facility Construct storage facility of approximately 10,000 square feet. <br /> Maintenance Equipment Storage Building Construct 11,000 square foot open structure to protect stored maintenance vehicles PlanlPolicy Document: <br /> and equipment from inclement weather. <br /> PIanlPolicy Document: PWM Roosevelt Facility Master Plan Total Project Cost: $350,000 <br /> Total Project Cost: $400,000 <br /> Whitaker Police Substation Purchase land and building at 5th and Blair for a permanent public safety station. <br /> New Northwest Fire Station Construct fire station to extend coverage in NW area of city. PlanlPolicy Document: Community Policing <br /> PIanlPolicy Document: LCOG 1998 fire Station Location Study Total Project Cost: $250,000 <br /> Total Project Cost: $3,100,000 <br /> New Police Departmer>t Building New building to house entire Police Department including secure parking for police <br /> vehicles. Refer to master space planning document prepared by consultant. <br /> PIanlPolity Document: Police Master Space Study. <br /> Total Project Cost: $2,600,000 <br /> City of Eugene • 2000-2005 Capital Improvement Program City of Eugene • 2000.2005 Capital Improvement Program <br /> Project and Program Areas -Building and Park Facilities Project and Program Areas- Building and Park Facilities <br /> 27 28 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.