New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
FY 2000-05 Eugene CIP Draft
COE
>
PW
>
Admin
>
Execs
>
Executive non-confidential
>
Historical
>
FY 2000-05 Eugene CIP Draft
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/8/2009 12:26:34 PM
Creation date
6/1/2009 12:32:36 PM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Administration
PWA_Project_Area
Miscellaneous
PW_Subject
CIP
Document_Date
11/30/1998
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> Airport -Six-Year Funded Program Airport -Unfunded Program <br /> Runway 3-21 Safety Improvements To comply with an FAA mandate to meet safety standards, improvements to the ends <br /> of Runway 3.21 will include a runway safety area upgrade, file open stormwater <br /> ditches, relocation of security fencing, and relocation of Greenhill Road to the east. Table Of Unfunded PrOjeCtS <br /> I (Figures in $1000's) <br /> PIanlPolity Document: FAA, Airport Master Plan, State 5-year Plan <br /> Total Project Cost: $3,900,000 New Capital Facilities <br /> Air Cargo Building 503 <br /> Total $503 <br /> <br /> New Capital Facilities ' <br /> Parallel Runway Engineering & Design Engineer and design a new parallel runway. <br /> I <br /> PIanlPolity Document: Airport Master Plan, FAA & State 5 Year Plan, Approved Description Of Unfunded Projects <br /> PFC Application <br /> Total Project Cost: $750,000 New Capital Facilities <br /> Air Cargo Building Construct air cargo building at south end of airport, including storage for cargo and <br /> cargo planes, offices for cargo operations, etc. <br /> Parallel Runway Phase 1(2003) Clear and grub for 6,000 foot runway. Pave and light 4,000 feet of runway and PlanlPolity Document: Airport Master Plan, <br />FAA & State 5 Year Plan <br /> turnarounds. Construct connector taxiway with lights. ToW Project Cost: $503,000 <br /> PlanlPolicy Document: Airport Master Plan, FAA & State 5 Year Plan <br /> Total Project Cost: $7,100,000 <br /> i <br /> Parallel Runway Phase 2 (2004) Pave and light 2000 feet of additional runway length and complete parallel and Iii <br /> connecting taxiways. Finish grading and utilities. <br /> PlanlPolicy Document: Airport Master Plan, FAA & State 5 Year Plan <br /> Total Project Cost: $7,186,000 <br /> Taxiway Extension and Ramp Cnstrdn Construction of a taxiway extension and ramp on the east side of Greenhill Road to <br /> facilitate general aviation development. <br /> PlanlPolicy Document: Airport MasterPlan, Airport Advisory Committee <br /> Total Project Cost: $900,000 <br /> I <br /> I <br /> City of Eugene • 2000.2005 Capital Improvement Program City of Eugene • 2000-2005 Capital Improvement Program <br /> Project and Program Areas -Airport Project and Program Areas -Airport <br /> 15 16 <br /> i <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.