New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
City Streets: Investing in a Neglected Asset
COE
>
PW
>
Admin
>
Execs
>
Executive non-confidential
>
Historical
>
City Streets: Investing in a Neglected Asset
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/8/2009 12:36:03 PM
Creation date
6/1/2009 12:31:55 PM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Administration
PWA_Project_Area
Road Repair
PW_Subject
Road Repair
Document_Date
3/31/2007
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY OF BAKER CITY <br />Baker City Street Fund Revenue FY 05.06 transportation systems development charge. Local <br />improvement districts and residential developments <br />are the only sources of new construction. <br />~~ Other Revenue <br />j Locally-Raised Revenue <br />. ~ State Highway Fund Revenue <br />In terms of local street fund revenue for <br />maintenance, Baker Ciry does not have any local <br />fees or taxes (such as a gas tax). There have been <br />recent discussions on a staff level about a <br />transportation user fee that would be added to <br />water/sewer utility bills. As little as $2 per month. <br />added to each utility bill (approximately 4,000 <br />accounts) could result in an additional $96,000 for <br />the street maintenance fund (a 23 percent increase). <br />The public has been concerned about additional <br />taxes and fees, so the issue has not moved beyond <br />the staff level. <br />After the annual street inventory, the public works department selects the streets that are the most <br />critical to repair, beginning with streets to consider for an overlay and candidates for a fog seal. <br />Preparation work requires a large portion of the street maintenance budget and reduces funds <br />available for the actual application of an overlay. Unless Baker City implements new revenue <br />sources, the problem will compound from year to year due to a backlog of maintenance projects. <br />Baker City's Critical Street Project List: _ . <br />1. Resort Street: Condition -Several blocks of this major street in the Historic District are in <br />poor condition and are in need of street reconstruction, new curbs, gutters, and sidewalks. <br />Estimated Cost: $197,000 (overlays only), <br />2. Btrch Street: Condition - 4 blocks of a connector gravel street need to be paved. <br />Estimated Cost: $350 000. <br />3. Walnut Street: Condition - A local connector gravel street, needing a complete street <br />construction (including curbs and gutters). Estimated Cost: $250.000. <br />4. Reservoir Road: Condition - A chip sealed gravel road, needing major patching and <br />overlay. Estimated Cost: $80,000. <br />5. B Street: Condition -One block of a former dead-end street is now an entrance to a <br />grocery store parking lot. The additional traffic has accelerated the deterioration of an <br />already poor street. The base has failed, and a complete reconstruction is needed. <br />.Estimated Cost:. $117,000. <br />CITY OF CORVALLIS <br />The city estimates a need for $3.5 million to maintain current street services. Measure 50 has <br />led Corvallis to shift 100 percent of property tax out of road funding. Compared to the projected <br />actual for fiscal year 2006-07 of $2.9 million, the difference in these two numbers equals a 6 <br />cents per gallon local gas tax. <br />CORVALLIS QUICK FACTS <br />2006 Population: 53,900 <br />(an increase of 9 percent in the last 10 years) <br />• Funding Need: An additional $950,000 annually is needed to <br />maintain Corvallis' 387 lane miles of streets ($600,000 to <br />maintain at current service levels, and $350,000 to restore to <br />previous levels). A total cost of $3 million is needed to bring all <br />streets up to "good" condition. <br />Highways 20, 34, and 99 West run through the Corvallis. <br />Local Economy: Mixed Commercial. Higher Education -Oregon State University. <br />Technology -Hewlett-Packard. <br />Corvallis needs an additional $950,000 per year to fully maintain streets, and return service levels <br />to previous standards. In 1993, Corvallis was in a good position to provide adequate street <br />funding -including pavement maintenance at an average rating of 85 out of 100. The city had <br />system development charges (SDCs) to provide extra capacity; development requirements to <br />provide adequate street and sidewalk <br />infrastructure; an updated state gas tax that <br />Corvallis Street Fund Revenue FY 05-06 provided adequate funding for maintenance and <br />operations; and a charter mileage levy dedicated to <br />the street fund that was growing with assessed <br />values. <br />4 Locally-Raised Revenue <br />~ State Highwayfund Revenue <br />Since 1993, the highway fund has been reduced by <br />inflation and Measure 50 moved the mileage levy <br />to the general fund. Other priorities (such as fire, <br />police, parks, transit, library and planning) reduced <br />the street funds' share of property tax revenues <br />until they were eliminated in fiscal year 2002-03. <br />As revenue declined, the burden on the street fund <br />increased with 35 percent of the cost of street <br />lighting moving from the general. fund to the street <br />fund. <br />City Streets: Case Studies -Page 18 City Streets: Case Studies -Page 19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.