now limited by the current electrical <br /> capacity. <br />Extend the Park Block plaza X An opening in the east wall of the <br />to the east eastern block was built Spring <br /> 2001. <br />Create an inventory of X <br />movable event seating <br />Install a tourism kiosk X <br />Redesign the NW corner of X 90% Done with work in 2002. Now <br />8th and Oak a low priority. Re-location of <br /> phone would increase flexibility of <br /> use of corner. Would require <br /> action by Lane County. <br />Paint a mural on the building X <br />at Hawthorne Building" alley <br />Reduce pedestrian crossing X Completed on NE corner. <br />distances on 8th and Oak by <br />bulbing out the corners <br />Items for Future Discussion and Analysis <br />Reconsider the Market's parking fee charges and the City fees to Eugene-in-common <br />Encourage redevelopment of the "Butterfly Lot" to a more compatible use <br />Provide programming in the free speech area <br />Close Oak north of 8th for more vending area on Saturday <br />Switch side of street for existing parallel and diagonal parking on both East and <br />m ~ ~ ~~ ~ <br />