New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
FY 2005-09 Lane County CIP
COE
>
PW
>
Admin
>
Execs
>
Executive non-confidential
>
Historical
>
FY 2005-09 Lane County CIP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/8/2009 12:12:10 PM
Creation date
6/1/2009 12:30:50 PM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Administration
PWA_Project_Area
Miscellaneous
PW_Subject
Lane County CIP
Document_Date
6/30/2009
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
LANE COUNTY PUBLIC WORKS CAPITAL IMPROVEMENT PROGRAM <br /> Jasper Road Extension - S. 57th Street to Jasper Road <br /> South 57"' Street to Jasper Road <br /> Project 19942 <br /> Category: GENERAL CONSTRUCTION <br /> Scope: Phase 2 construction of a new arterial between the Eugene-Springfield Highway and the Springfield-Creswell <br /> Highway. The roadway will include a rural section and an improved, at-grade, railroad crossing and <br /> intersection with Jasper Road. <br /> Justification: The new extensionwould shift through traffic away from the local street network. <br /> 1=Y 2005 <br /> Cost: 2,500,000 <br /> RIW: 125,000 <br /> TC}TAL: 2,625,000 <br /> Jasper-Lowell Road, MP 10.545-11.006 .Road 6220-00 <br /> Pioneer Street to Dexter Lake MP: 10.545 to 11.006 <br /> Project 6220-3 FC: Urban Collector <br /> Categoiy: COMMUNITY DEVELOPMENT ROAD IMPROVEMENT ASSISTANCE PROGRAM <br /> Scope: Reconstruct existing improved section. <br /> Justification: Request from City of Lowell to improve pedestrian conditions as well as pavement condition in lieu of just a <br /> preservation project. <br /> FY 2006 <br /> Cost: • 470,000 <br /> RlW; 0 <br /> TC7TAL: 470,000 <br /> Judkins Point Interchange North <br /> Glenwood Boulevard at Interstate 5 <br /> Project 0875-5 <br /> Category: COMMUNITY DEVELOPMENT ROAD IMPROVEMENT ASSISTANCE PROGRAM. <br /> Scope: Ramp Improvements on north side of interchange. <br /> Justification: Part of a larger set of improvements on both sides of the interchange. <br /> FY 2005 <br /> Cast: 200,000 <br /> RNV: <br /> TCITAL: 200,000 <br /> <br /> Latham Road, MP 0.00-0.965 Road 2699-00 <br /> Highway ss to South 6"' Street RJ9P: 0.00 t0 0.965 <br /> Project 2699-2 FC: Rural Minor Collector <br /> Category: PEDESTRIAN AND BICYCLE IMPROVEMENTS <br /> Scope: Project may consist of the installation of bike lanes, sidewalks, striping to delineate bike lanes, or the addition <br /> of paved shoulders for bike and pedestrian use. <br /> Justification: A list of bike and pedestrian projects was created under the Transportation System Plan for areas outside of <br /> cities serving destinations such as stores, schools and community centers in rural communities. This project <br /> was identified in the Cottage Grove TSP. <br /> ~Y 2007 <br /> Casf: 580,000 <br /> RNV: <br /> T©TAL: 580,000 <br /> 32 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.