LANE COUNTY PUBLIC WORKS CAPITAL IMPROVEMENT PROGRAM <br /> Dillard Road, MP 0.00 to 4.02 Road 1s7o-oo <br /> Highway 99 to Eugene UGB MP: .0.00 to 4.016 <br /> Project 1870-1 FC: Minor Collector <br /> Category: GENERAL CONSTRUCTION <br /> Scope: Shoulder widening <br /> Justification: This road is popular with bicyclists that like to climb hills on rural routes. Currently there is little or no _ <br /> accommodation for bicycles. <br /> FY 2007 <br /> Cost: 2,400,000 <br /> R/W: 240,000 <br /> TOTAL: 2,640,000 <br /> Franklin Boulevard East Raad 1s25-oo <br /> I-5 Frontage to Twin Buttes Road MP: 0.00 to 1,121 <br /> Project 1825-1 FC: Major Collector <br /> Category: GENERAL CONSTRUCTION <br /> SCOpe: Widen and Overlay ` <br /> Justification: Identified through Lane County TSP needs analysis, .Project #85. Targeted for improvements due to its <br /> substandard width and relatively high ADT of 4800. Projected increases in traffic warrant modernization of <br /> this section with the addition of adequate paved shoulders. <br /> FY: 2008 <br /> Cost: 2,300,000 <br /> RtW: 230,000 <br /> TCJTAL: 2,530,000 <br /> Game Farm Road North, MP 0.413 to 1.69 Road 1710-00 <br /> Springfield city limits to Coburg Road. MP: 0.413 to 1.69 <br /> Project 1710-1 FC: Urban Collector <br /> Category: GENERAL CONSTRUCTION <br /> Scope: Improve to urban standards. <br /> Justification: TransPlan Project #654 -Identified from list of urban. collector/arterials (roads within Urban Growth <br /> Boundaries) without urban standards. Located in the north Eugene area with a large amount of developable <br /> land, Game Farm Road North will experience an increase of traffic in the future. <br /> FY: 2005 <br /> Cost: 2,750,000 <br /> RiW: 275,000 <br /> TOTAL: 3,025,000 <br /> <br /> Green Hill Road, MP 1.869-5.072 goad 4270-00 <br /> Royal Avenue to Clear Lake Road. MP: 2618 t0 5.072 <br /> Project 4270-1 FC: Rural Major Collector (FAS) <br /> Category: GENERAL CONSTRUCTION <br /> • Scope: Addition of shoulders, curb and gutter, orcombination thereof. <br /> Justification: This roadway borders along the edge of the urban growth boundary and also serves as a major route to Fern <br /> Ridge Reservoir, the Eugene Airport, and the community of Alvadore. <br /> FY 2007 <br /> Cost: 2,000,000 <br /> Rf~'V: 200,000 <br /> TOTAL: 2,200,000 <br /> 30 , <br /> <br />