LANE COUNTY PUBLIC WORKS CAPITAL IMPROVEMENT PROGRAM <br /> Bernhardt Heights Road Road 5052-00 <br /> MP: 0.00 to 0.350 <br /> Project 5052-1 FC: Rural Local <br /> Category: GENERAL CONSTRUCTION <br /> Scope: Realignment using existing BPA private roadway and establishing new roadway up to neighborhood. <br /> Justification: Road stability problems persist along this narrow, steep gravel road. <br /> FY 2005 <br /> Cost: 350,000 <br /> ' RNU: 35,000 <br /> TOTAL: 385,000 <br /> Bolton Hill Road Road <br /> Territorial Highway to Dogwood Lane NIP: 0.00 to 0.653 <br /> Praject 4062-2 FC: Rural Major Collector <br /> Category: GENERAL CONSTRUCTION <br /> Scope: Improve to urban standards. <br /> Justification: Lane County TSP Project #15. City of Veneta TSP Project # B5. <br /> FY 2009 <br /> Cost: 1,300,000 <br /> R11IU: 130,000 <br /> TOTAL: 1,430,000 <br /> _ _ <br /> Brice Creek Road, MP 6.7 Road 24ao>oo <br /> Slide Repair RAP: 6.7 <br /> Project 2470-4 FC: Minor Collector <br /> Category: SAFETY IMPROVEMENTS <br /> Scope: Slide Repair <br /> Justification: This project was one of six identified along this road by the US Forest Service as a candidate for Forest <br /> Highway Enhancement funds. Four sites have been completed.. MP 6.7 is the next priority..,:.. <br /> FY 2006 <br /> Cost: 200,000 <br /> RIUV: 0 <br /> TOTAL: 200,000 <br /> €Jv'TE: Will use the remaining $115,000 of Forest Highway funds: <br /> Bridge Projects -Miscellaneous <br /> Category: RIGHT-OF-WAYACOUISITION <br /> Scope: Funds to use for additional right-of--way for bridge projects as needed. <br /> <br /> , Justif€cation: Until final designs are determined, exact right-of--way requirements are not known. This fund allows the <br /> Right-of-Way Management Section to acquire right-of-way as needed. <br /> FY 2005 <br /> Cost: NA <br /> Rf1flf: 75,000 <br /> TOTAL: 75,000 <br /> 27 <br /> <br />