Water Main Replacements -Project No, 14152
<br />This project covers the need to replace mains that have become dilapidated or obsolete primarily
<br />due to corrosion, inadequate main size, or poor piping material. Investigation of pipe conditions
<br />must be conducted over time in order to prioritize replacement needs.
<br />EWEB uses several factors to determine when to replace a main. Some are: age of pipe, pipe
<br />material, soil conditions, leak history, fire flow capability, potential water quality impacts. All of
<br />these factors help determine which pipe needs to be replaced.
<br />Individual descriptions of main replacements are not included in this CIP. All project monies are
<br />derived from rate capital.
<br />Cast Iron & Steel Main
<br />Realacements 2003 2004 2005 2nn6 2n07 2nnz_m ~nn4_, ~
<br />Rose Lane Main Re lacement $23,300 $60,000 $83,300
<br />Norbert Lane $34,843 $34,843
<br />22"~ Ave Main $82,378 $82,378
<br />W. 11 -Willow Creek to
<br />Arrowsmith
<br />$64,272
<br />$64,272
<br />E. 17~' Ave, A ate to Columbia $46,910 $46,910
<br />Washington, 11~' to 12"' $31,348 $31,348
<br />Hi h St. 3'~ to 6"' $119,823 $119,823
<br />Fairmont Blvd-Villard to
<br />Orchard
<br />$26,470
<br />$26,470
<br />Asbestos/Cement
<br />Main Re lacements
<br />Bethel Drive A/C Main
<br />Re lacement
<br />$110,000
<br />$ 0
<br />Berntzen St. Elmira to Ro al $107,496 $110,000
<br />Chase & Tane , Ro al to Bell $110,147 $107,496
<br />Taft St. Main Re lacement $137,000 $137,000
<br />Main Reptacements -Not Yet
<br />Identified
<br />$203,000
<br />$400,000
<br />$400,000
<br />$400,000
<br />$137,000
<br />$2,000,000
<br />Total $646,987 $800,000 $ 0 $ 0 $110,000 $3,337,827 $ 0
<br />
<br />Water Division -Five-Year Capital /mprovement Plan
<br />26