Water Main Replacements -Project No, 14152 <br />This project covers the need to replace mains that have become dilapidated or obsolete primarily <br />due to corrosion, inadequate main size, or poor piping material. Investigation of pipe conditions <br />must be conducted over time in order to prioritize replacement needs. <br />EWEB uses several factors to determine when to replace a main. Some are: age of pipe, pipe <br />material, soil conditions, leak history, fire flow capability, potential water quality impacts. All of <br />these factors help determine which pipe needs to be replaced. <br />Individual descriptions of main replacements are not included in this CIP. All project monies are <br />derived from rate capital. <br />Cast Iron & Steel Main <br />Realacements 2003 2004 2005 2nn6 2n07 2nnz_m ~nn4_, ~ <br />Rose Lane Main Re lacement $23,300 $60,000 $83,300 <br />Norbert Lane $34,843 $34,843 <br />22"~ Ave Main $82,378 $82,378 <br />W. 11 -Willow Creek to <br />Arrowsmith <br />$64,272 <br />$64,272 <br />E. 17~' Ave, A ate to Columbia $46,910 $46,910 <br />Washington, 11~' to 12"' $31,348 $31,348 <br />Hi h St. 3'~ to 6"' $119,823 $119,823 <br />Fairmont Blvd-Villard to <br />Orchard <br />$26,470 <br />$26,470 <br />Asbestos/Cement <br />Main Re lacements <br />Bethel Drive A/C Main <br />Re lacement <br />$110,000 <br />$ 0 <br />Berntzen St. Elmira to Ro al $107,496 $110,000 <br />Chase & Tane , Ro al to Bell $110,147 $107,496 <br />Taft St. Main Re lacement $137,000 $137,000 <br />Main Reptacements -Not Yet <br />Identified <br />$203,000 <br />$400,000 <br />$400,000 <br />$400,000 <br />$137,000 <br />$2,000,000 <br />Total $646,987 $800,000 $ 0 $ 0 $110,000 $3,337,827 $ 0 <br /> <br />Water Division -Five-Year Capital /mprovement Plan <br />26 <br />