Engineering $ 40,000 SDC Funded $200,000 <br />EWEB Labor $ 60,000 Rate Funded Capital $160,000 <br />Building & Construction $115,000 <br />Equipment $110,000 <br />Administration 35 000 <br />Total Cost $360,000 <br />Emergency Generator Transfer Switches <br />In preparation for Y2K, EWEB retro-fitted 12 of its 32 pump stations for emergency generator back-up: This <br />was done by installing new electrical generator transfer switches. These transfer switches are located so EWEB <br />crews can drive a portable generator within 50 feet of the transfer switch panel, and operate our pump station <br />during power outages. EWEB plans to retro-fit 6 more stations over the next 5 years. <br />Typical cost per station: <br />Engineering $ 2,000 SDC Funded 0 <br />Equipment $ 8,000 Rate Funded Capital $15,000 <br />Labor $ 4,000 <br />Administration 1000 <br />Total Cost $15,000 <br />.~~; , ~'utex~Divrsion: Five,-,Ye~ar,,.,Gapital;tmgroyg{ngnt Plan. " <br />rM~16 ~. <br />