New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
2003-07 EWEB CIP Draft
COE
>
PW
>
Admin
>
Execs
>
Executive non-confidential
>
Historical
>
2003-07 EWEB CIP Draft
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/8/2009 12:30:48 PM
Creation date
6/1/2009 12:30:45 PM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Administration
PWA_Project_Area
Miscellaneous
PW_Subject
EWEB CIP
Document_Date
9/30/2002
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Pump Stations -Project No. 14204 <br />EWEB has 32 pump stations that typically pump to higher elevation reservoirs in the south hills <br />of Eugene. Of those 32 stations, nine are continuous running pump stations that provide <br />domestic service and in some cases, fire service, to the geographical area it serves. Two pump <br />stations act as booster pump stations in our systems base level. <br />This program replaces underground pump stations constructed in the early to mid 1960s. These <br />pump stations were built at low cost using modified electrical vaults. They do not meet OSHA <br />requirements for safety, tend to flood in heavy rain events, and provide a hostile environment for <br />pumping and electrical equipment. <br />Pump Station Rebuild <br />Program 2003 2004 2005 2nn6 2nn~ ~nnz_n~ ~nnv ,~ <br />Willamette 975 $139,900 $250,000 $389,900 <br />Gillespie Butte 800 <br />Design & <br />Construction $100,000 $100,000 $157,000 <br />City View 975 Design <br />& Rebuild $100,000 $100,000 $260,000 <br />Laurel Hi11850 Pump <br />Station U grade $70,000 $70,000 <br />City View 1150 Design <br />& Construction $40,000 $40,000 $320,000 <br />Laurel Hill 975 Design <br />& Construction $355,000 <br />Dillard 800 Design & <br />Construction $100,000 $100,000 $260,000 <br />Continued Pump <br />Station Rebuilds $1000 000 <br />Timberline 800 Pump <br />Station $360,000 <br />Summit Terrace 1325 <br />Pum Station $130,560 $130,560 <br />Emergency Generator <br />Transfer Switches $36,300. $36,000 $72,300 <br /> <br />Total Pum Stations $306,760 $356,000 $100,000 : $40,000 $200,000 $1,002,760 $2,712,000 <br />Project Descriptions: <br />Willamette 975 Pump Station <br />The Willamette 975 Pump Station is located underground in the Willamette Street right of way and has <br />experienced flooding. The project cost estimate is listed below. Land acquisition occurred in 2001. <br />Engineering $ 40,900 SDC Funded $ 0 <br />EWEB Labor $ 77,000. Rate Funded Capital $389,900 <br />Building & Construction $ 150,000 <br />Equipment $ g7,Opp <br />Administration 35 000 <br />Total Cost $389,900 <br />Water Division -Five-Year Capital Improvement Plan <br />13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.