Public Buildings and Facilities Unfunded Projects <br /> in thousands of dollars <br /> _ - - <br /> . <br /> • ~ ~ ' <br /> Hult Center Lighting Replace lighting instrument inventory and control systems in <br /> Instrument Inventory & both Silva and Soreng halls. Current lighting inventory is <br /> Control Systems Replacement obsolete and has high failure rates. The equipment is also <br /> Plan/Policy Document: very energy inefficient. <br /> None <br /> - Costs: <br /> 2007 Total <br /> Capital $250 $250 <br /> Total $250 $250 <br /> Hult Center Silva Hall Sound Replace Silva Hall's Front of House (FOH) sound system with <br /> System Replacement line array technology. Current system does not provide . <br /> coverage throughout the hall. <br /> Plan/Policy Document: <br /> _ None <br /> ( <br /> Costs: <br /> 2008 Total <br /> Capital $250 $250 <br /> Total $250 $250 <br /> i <br /> ' Hult Stage Loading Gallery & Current system is incorrectly designed, very inefficient and <br /> ' S stems Re air & Re lace <br /> Y P P extremely costly. <br /> Plan/Policy Document: <br /> None <br /> t <br /> - Costs: <br /> <br /> ( 2007 Total <br /> Capital $500 $500 <br /> ` Total $500 $500 <br /> City of Eugene 2006-2011 Capital Improvement Program <br /> 91 <br /> . <br /> <br />