New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
FY 2006-11 Eugene CIP
COE
>
PW
>
Admin
>
Execs
>
Executive non-confidential
>
Historical
>
FY 2006-11 Eugene CIP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2009 8:05:31 AM
Creation date
6/1/2009 12:30:01 PM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Administration
PWA_Project_Area
Miscellaneous
PW_Subject
CIP
Document_Date
6/30/2011
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
184
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
~ . ~ . ~ <br /> Site-specific CIP projects shown in funding tables for 2006-2011 as $50,000 or more <br /> Expand Air Cargo Ramp <br /> ' Rehab South Ramp <br /> ~ Airport Tower Ramp/Taxilane Rehab <br /> Baggage Area Pavement Rehab <br /> Terminal Building Expansion <br /> ` ~ Stairway Enclosure -North Side <br /> Terminal Concrete Ramp Rehab <br /> Airport Emergency Operation Center Upgrade <br /> Rehab South Part of North Ramp <br /> ~ Taxiway Echo & Alpha 5 Rehab <br /> Overlay of Runway 34/16 <br /> C <br /> ~ Access Road Im rovements and Si na e <br /> p g 9 <br /> General Aviation Terminal <br /> Site-specific major CIP projects previously <br /> funded but not currently constructed <br /> C- ~ <br /> m Aircraft Wash Station <br /> ` ' • Airfield Equipment Storage Bldg <br /> i <br /> m Airport Road Realignment <br /> LandAquisition <br /> t. <br /> m Construct Parallel Runway Phase Five <br /> ~ Car Rental Relocation <br /> ~ ~ ~ . Taxiway F- A/6 Rehabilitation <br /> ; <br /> m Taxiway Rehabilitation <br /> Wetland Delineation Mitigation Figure 1b <br /> <br /> 1, <br /> 37 <br /> _ <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.