Transportation Unfunded Projects <br /> in thousands of dollars <br /> . _ _ <br /> ~ B . <br /> _ _ _ <br /> Berntzen Rd-Royal Ave. to Upgrade to 28-foot residential street. Improvements include <br /> Elmira Rd. street lights, street trees, and planting strips and sidewalk on <br /> _ both sides of the street. Total right-of-way required is <br /> Plan/Policy Document• 55-feet. Project will improve delivery of fire services from <br /> ad'acent station <br /> Trans/Plan <br /> ~ Costs: <br /> 2007 Total <br /> \ ~ Capital $572 $572 <br /> ' Total $572 $572 <br /> Bethel Drive (Hwy. 99- Upgrade and capacity enhancements to a 2-lane urban <br /> Roosevelt) facility from Roosevelt Blvd. to Hwy. 99. Two 10-foot travel <br /> lanes with 5-foot bike lanes, and 5' setback sidewalk on both <br /> Plan/Policy Document: sides. <br /> Trans/Plan <br /> Costs: <br /> 2011 Total <br /> - Capital $4,924 $4,924 <br /> Total $4,924 $4,924 <br /> i <br /> Bike Path/Martin Luther King Add sidewalk to bridge and approaches. Modify guard rail on <br /> Overpass existing bridge at Martin Luther King Blvd. and I-5. <br /> ~ <br /> ~ Plan/Policy Document: <br /> ' Trans/Plan <br /> Costs: <br /> 2012 Total <br /> Capital $152 $152 <br /> . ~ <br /> Total $152 $152 <br /> <br /> E <br /> <br /> r' <br /> <br /> i.. <br /> City of Eugene 2006-2011 Capital Improvement Program <br /> 149 <br /> <br />