' Transportation Funded Projects <br /> a...,~... .w:~.,:.~s°.....w..,.:~:~~,.,....~',.:~~..;.5.... .r ~^c., r-: -^:ec . .a.~` .:a..~..,E.~...~.,.........~.,...~..W...W:.~;=`~~::«.W.t.~~;~.~'"~".ax <br /> .W._y~~ <br /> _ / <br /> i , > in thousands of dollars <br /> <br /> 1 <br /> ~ <br /> 1 Bike Path/South Bank Trail Twelve-foot wide multi-use path connecting Autzen <br /> ~ Footbridge with the Knickerbocker Path along the south bank <br /> of the Willamette River. <br /> j Plan/Policy Document: <br /> Trans/Plan <br /> Costs: <br /> r__'' 2008 Total <br /> Capital $3,863 $3,863 <br /> Total $3,863 $3,863 <br /> l~~ ~ <br /> ~ <br /> Bike Path/West Bank Trail- Construct a portion of the West Bank Trail from the <br /> Wastewater Treatment Plant to wastewater treament plant to the existing trail segment at <br /> Format Ave. Format Avenue. <br /> t <br /> Plan/Policy Document: <br /> Trans/Plan <br /> ~~1 <br /> Costs: <br /> 2010 Total <br /> Capital $1,116 $1,116 <br /> Total $1,116 $1,116 <br /> ~ Bike Path West Bank <br /> / Construct a 12' multi-use path from the Lane County project <br /> Trail-Beaver Road to at Beaver Street under the Beltline Road Willamette River <br /> 4 Wastewater Treatment Plant Bridge to the existing river front trail at the wastewater <br /> Plan/Policy Document• treatment plant. Approximately 4050-feet in length. <br /> Trans/Plan <br /> . <br /> Costs: <br /> 2008 Total <br /> { Capital $1,001 $1,001 <br /> Total $1,001 $1,001 <br /> ~1 <br /> City of Eugene 2006-2011 Capital Improvement Program <br /> 133 <br /> _ _ _ <br /> <br />