1 ~ ~ ~ --_....~......~mm~. ~....r._R~ <br /> Stormwater Funded Projects <br /> i <br /> in thousands of dollars <br /> i <br /> ® , <br /> J:~_ <br /> \ <br /> 1 <br /> Ayres Pond Outfall Retrofit Install a stormwater quality structure (CDS) upstream of the ' <br /> outfall to Ayres Pond to remove large debris from the ; <br /> inaccessible lower portions of the open channel. Retrofit the <br /> Plan/Policy Document• existing outfiall structure with a larger concrete pad and ' _ <br /> • energy dissipaters. <br /> CSWMP; Stormwater Basin Plans ~ <br /> . _.1 <br /> } <br /> ~ COStS: <br /> 2009 2010 2011 Total <br /> Capital $78 $348 $348 $774 <br /> ~ Total $78 $348 $348 $774 <br /> i <br /> General Stormwater Rehabilitate, reconstruct and install stormwater system <br /> Rehabilitation where needed due to various problems, such as deterioration <br /> I, due to age, poor materials, localized flooding, and/or <br /> Plan/Policy Document• systems limitations. Where feasible, natural systems are <br /> f ~ <br /> • used to address existing problems in conformance with <br /> Public Facilities Plan & Services; CSWMP. <br /> 'i Comprehensive Stormwater Management <br /> Plan; Stormwater Basin Plans ~ <br /> Costs: ~ ~ <br /> 2008 2009 2010 2011 Total <br /> Capital $25 $50 $50 $70 $195 <br /> Total $25 $50 $50 $70 $195 <br /> I <br /> l <br /> Outfall Stabilization Retrofit storm drainage system outfalls which are creating <br /> bank stability problems along the Amazon Creek and the <br /> Willamette River within the City of Eugene. ~ ' <br /> Plan/Policy Document: r':.. <br /> CSWMP; Stormwater Basin Plans <br /> Costs: <br /> 2006 2007 2008 2009 2010 2011 Total , <br /> il. <br /> Capital $25 $25 $25 $40 $50 $50 $215 <br /> <br /> j Total $25 $25 $25 $40 $50 $50 $215 <br /> City of Eugene 2006-2011 Capital Improvement Program <br /> i <br /> 106 <br /> <br />