. <br /> r ~ <br /> Stormwater Funded Projects <br /> a.~ ~ ~ ~ _ .e <br /> ~ ~ <br /> i in thousands of dollars <br /> ~ ~ ~ <br /> _ ~ _ , <br /> . ~ a <br /> _ <br /> i <br /> ' Gilham Rd System Culvert Replace the existing culvert with a pedestrian bridge to } <br /> ~ Replacement (WK08A) maintain trail access. Reconstruct the channel to match the <br /> ~ size and shape of the downstream open waterway. ` <br /> Plan/Policy Document: <br /> CSWMP; Stormwater Basin Plans <br /> <br /> .I <br /> Costs: <br /> ~ 2008 Total <br /> i <br /> ~ Capital $32 $32 <br /> Total $32 $32 <br /> i <br /> I <br /> I <br /> i <br /> Royal Node Stormwater Enhance existing open waterways to achieve multiple <br /> Infrastructure benefits including conveyance, water quality, and natural <br /> enhancements. <br /> ' Plan/Policy Document: <br /> CSWMP; Stormwater Basin Plans, Royal <br /> Node Plan <br /> ,-~7 <br /> COStS: t~: <br /> 2006 2010 2011 Total <br /> j Capital $475 $400 $330 $1,205 <br /> Total $475 $400 $330 $1,205 <br /> i <br /> Water Quality Facilities -High Construct underground structural water quality facilities in <br /> Source Areas developed, high pollutant source areas. <br /> r <br /> Plan/Policy Document: <br /> CSWMP; Stormwater Basin Plans <br /> Costs: <br /> 2006 2007 2008 2009 2010 2011 Total <br /> Capital $45 $25 $25 $100 $100 $125 $420 <br /> Total $45 $25 $25 $100 $100 $125 $420 <br /> 1 <br /> i <br /> I <br /> i <br /> City of Eugene 2006-2011 Capital Improvement Program <br /> 104 1' <br /> <br />