New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
FY 2002-07 Eugene CIP (2)
COE
>
PW
>
Admin
>
Execs
>
Executive non-confidential
>
Historical
>
FY 2002-07 Eugene CIP (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2009 8:02:40 AM
Creation date
6/1/2009 12:29:53 PM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Administration
PWA_Project_Area
Miscellaneous
PW_Subject
CIP
Document_Date
6/30/2007
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Wastewater <br />Table of Funded Projects <br />(Figures in $1000's) <br />Preservation/Maintenance <br />Wastewater System Rehabilitation <br />New Capital Facilities <br />Legacy Interceptor South <br />Link Drive Wastewater Pump Station <br />Wastewater Services for New Development <br />tTotal <br />~ 2002 2003 ( 2004 2005 2006 2007 Total <br /> 2759 $2,759 <br /> 774 ~ $774 <br />115 115 115 115 115j 115 $690 <br />1151 1151 2874 889 115 115 $4,223 <br />2115 2115 4874 2889 2115 2115 $16,223 <br />tThese totals are not fund-specific and include all programmed funds. For information about specific funds and detailed project funding for <br />FY2002 and FY2003 , refer to the Two Year Fund Detail on the previous page(s). <br />Description of Funded Projects <br />Preservation/Maintenance <br />Wastewater System Rehabilitation <br />New Capital Facilities <br />Preserve and rehabilitate an aging wastewater system; decrease inflow and <br />infiltration and address increased wet weather flows. <br />Plan/Policy Document: Sanitary Sewer Master Plan, Infiltration-Inflow Program <br />Total Project Cost: $12,000,000 <br />Legacy Interceptor South 48" Interceptor from Avalon Street (2000 feet north of Royal) to Rooseveltlferry <br />intersection. <br />Plan/Policy Document: Urban Sanitary Sewer Master Plan, 1992 <br />Total Project Cost: $2,759,000 <br />Link Drive Wastewater Pump Station Construct Link Drive pump station between Awbrey Lane and Enid Road, Highway <br />99 and Prairie Road. <br />Plan/Policy Document: Urban Sanitary Sewer Master Plan, 1992 <br />Total Project Cost $774,000 <br />Ciry of Eugene 2002-2007 Capital Improvement Program <br />78 <br />
The URL can be used to link to this page
Your browser does not support the video tag.