New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
FY 2002-07 Eugene CIP (2)
COE
>
PW
>
Admin
>
Execs
>
Executive non-confidential
>
Historical
>
FY 2002-07 Eugene CIP (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2009 8:02:40 AM
Creation date
6/1/2009 12:29:53 PM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Administration
PWA_Project_Area
Miscellaneous
PW_Subject
CIP
Document_Date
6/30/2007
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Funding <br />The Wastewater Capital Program is supported by wastewater user fees, wastewater systems <br />development charges, and assessments to property owners.. These funds are currently <br />adequate to maintain the existing system as well as support new service areas and the current <br />effort of the I&I program. <br />The I&I program is a strategic approach designed to reduce or limit the amount of <br />groundwater/rainwater flow that is treated at the regional wastewater treatment plant as well <br />as retain the carrying capacity of the collection system and maintain the infrastructure. <br />Currently, illicit connections to the wastewater system or deterioration of the collection system <br />(open joints, cracks, etc.) are allowing excessive groundwater or rainwater to enter the system. <br />This reduces the carrying capacity of the collection system and contributes to large peaks in <br />the flows that are treated at the wastewater treatment plant. The Wet Weather Management <br />Study reinforces a focus on I&I reduction through user fees. <br />Expansion of the wastewater collection system is financed primarily by Assessments and <br />Systems Development Charges (SDCs) charged against new development. This CIP includes <br />proposed projects that will require the commitment of future local SDC revenues.. <br />City of Eugene 2002-2007 Capital Improvement Program <br />Page 75 <br />
The URL can be used to link to this page
Your browser does not support the video tag.