New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
FY 2002-07 Eugene CIP (2)
COE
>
PW
>
Admin
>
Execs
>
Executive non-confidential
>
Historical
>
FY 2002-07 Eugene CIP (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2009 8:02:40 AM
Creation date
6/1/2009 12:29:53 PM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Administration
PWA_Project_Area
Miscellaneous
PW_Subject
CIP
Document_Date
6/30/2007
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Transportation <br />Description of Unfunded Projects <br />Game Farm Road North Upgrade and capacity enhancement from Coburg Rd. to I-5. Two or three lane urban <br />facility. <br />Plan/Policy Document: Trans/Plan <br />Total Project Cost: $2,150,000 <br />Gilham Road Upgrade and capacity enhancements -upgrade to two lane urban facility from the <br />northern most new collector to Ayres Road. <br />Plan/Policy Document: Trans/Plan <br />Total Project Cost: $690,000 <br />jeppesen Acres Road Upgrade and capacity enhancement to 2-lane urban facility from Gilham Road to <br />Providence Street. <br />Plan/Policy Document: Trans/Plan <br />Total Project Cost: $525,000 <br />Maple Street (Roosevelt- Elmira) Upgrade to a 2 lane urban facility. <br />Plan/Policy Document: TransPlan, Bethel-Danebo Refinement Plan <br />Total Project Cost: $210,000 <br />Neighborhood Traffic Calming Neighborhood traffic calming projects, including speed humps, diverters, chokers, <br />circles, and other street enhancements. Program addresses neighborhood traffic <br />problems which are prioritized with the assistance of neighborhood organizations. <br />This figure represents the unfunded need for the six-year CIP period. <br />Plan/Policy Document: Trans/Plan <br />Total Project Cost: $520,000 <br />Priority Sidewalk Installation Projects Install new sidewalks based on the sidewalk priority rating system in the adopted <br />City of Eugene Sidewalk Program. This figure represents the unfunded need for the <br />six-year CIP period. <br />Plan/Policy Document: TransPlan Policy, TRIP, City Sidewalk Program <br />Total Project Cost: $2,300,000 <br />Railroad Crossing Update Program Replace deteriorated railroad crossings with high quality new materials to improve <br />the road surface <br />Plan/Policy Document: Trans/Plan <br />Total Project Cost: $300,000 <br />Sidewalk Access Ramps Install sidewalk access ramps at intersection corners and other needed access <br />locations throughout the City, including the installation of new ramps and <br />reconstruction of existing ramps to comply with ADA and City standards. This figure <br />represents the unfunded need for the six-year CIP period. <br />PIan/Policy Document: Trans/Plan Policy, ADA Regulations <br />Total Project Cost: $260,000 <br />City of Eugene 2002-2007 Capital Improvement Program <br />68 <br />
The URL can be used to link to this page
Your browser does not support the video tag.