Transportation <br />Description of Unfunded Projects <br />Game Farm Road North Upgrade and capacity enhancement from Coburg Rd. to I-5. Two or three lane urban <br />facility. <br />Plan/Policy Document: Trans/Plan <br />Total Project Cost: $2,150,000 <br />Gilham Road Upgrade and capacity enhancements -upgrade to two lane urban facility from the <br />northern most new collector to Ayres Road. <br />Plan/Policy Document: Trans/Plan <br />Total Project Cost: $690,000 <br />jeppesen Acres Road Upgrade and capacity enhancement to 2-lane urban facility from Gilham Road to <br />Providence Street. <br />Plan/Policy Document: Trans/Plan <br />Total Project Cost: $525,000 <br />Maple Street (Roosevelt- Elmira) Upgrade to a 2 lane urban facility. <br />Plan/Policy Document: TransPlan, Bethel-Danebo Refinement Plan <br />Total Project Cost: $210,000 <br />Neighborhood Traffic Calming Neighborhood traffic calming projects, including speed humps, diverters, chokers, <br />circles, and other street enhancements. Program addresses neighborhood traffic <br />problems which are prioritized with the assistance of neighborhood organizations. <br />This figure represents the unfunded need for the six-year CIP period. <br />Plan/Policy Document: Trans/Plan <br />Total Project Cost: $520,000 <br />Priority Sidewalk Installation Projects Install new sidewalks based on the sidewalk priority rating system in the adopted <br />City of Eugene Sidewalk Program. This figure represents the unfunded need for the <br />six-year CIP period. <br />Plan/Policy Document: TransPlan Policy, TRIP, City Sidewalk Program <br />Total Project Cost: $2,300,000 <br />Railroad Crossing Update Program Replace deteriorated railroad crossings with high quality new materials to improve <br />the road surface <br />Plan/Policy Document: Trans/Plan <br />Total Project Cost: $300,000 <br />Sidewalk Access Ramps Install sidewalk access ramps at intersection corners and other needed access <br />locations throughout the City, including the installation of new ramps and <br />reconstruction of existing ramps to comply with ADA and City standards. This figure <br />represents the unfunded need for the six-year CIP period. <br />PIan/Policy Document: Trans/Plan Policy, ADA Regulations <br />Total Project Cost: $260,000 <br />City of Eugene 2002-2007 Capital Improvement Program <br />68 <br />