Site-specific CIP projects shown in funding <br />tables for 2002-2007 as $50,000 or more. <br />~, ~ <br />-~ <br />,. <br />_~ <br />~ :.~ <br />nnB <br />9 <br />Delta Ponds habitat enhancements <br />Eugene Millrace restoration <br />Wetland Mitigation Bank <br />Willamette River bank restoration <br />3rd - 4th Connector Stormwater improvements <br />Greenhill tributary storm improvements <br />Hilyard Street pipe improvements <br />Hunsacker -open channel .improvements <br />Irvington Drive -Stormwater <br />Lenox/Salty -Culvert replacement <br />Martin Drive pipe improvements <br />River Road -Stormwater <br />Roosevelt Channel -Culvert Replacement <br />Augusta/I-5 water quality facility <br />Kinney Park neighborhood facility <br />Minor system between Riverview/Augusta <br />Pine View neighborhood facility <br />Polk Street water quality facilities <br />River Point Pond outlet channel <br />Royal node stormwater infrastructure <br />Ayres Pond outfall retrofit <br />Retrofit Empire Park Pond <br />.Figure 3b <br />