New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
FY 2002-07 Eugene CIP (2)
COE
>
PW
>
Admin
>
Execs
>
Executive non-confidential
>
Historical
>
FY 2002-07 Eugene CIP (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2009 8:02:40 AM
Creation date
6/1/2009 12:29:53 PM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Administration
PWA_Project_Area
Miscellaneous
PW_Subject
CIP
Document_Date
6/30/2007
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Building and Park Facilities <br />Description of Unfunded Projects <br />Site and Facility Improvements <br />9-1-1 Backup Center Incorporate the equipment infrastructure for plugging in mobile dispatch units into <br />either an existing facility or a new facility. <br />Plan/Policy Document <br />Total Project Cost: $100,000 <br />ADA Transition Plan for Parks Prepare system-wide assessment of accessibility of outdoor recreation facilities in <br />City parks. <br />Plan/Policy Document: Eugene Parks & Recreation Plan; ADA <br />Total Project Cost: $150,000 <br />City Hall Renovation Renovate City Hall to rectify existing mechanical, electrical, structural, code, and <br />other deficiencies. Address functional deficiencies and changing program <br />requirements of building users as well. <br />PIan/Policy Document: Facility Condition Report, City Hall Seismic Evaluation <br />(1995), Uniform Building Code. <br />Total Project Cost: $18,000,000 <br />Fre Stations Sanitary Sewer Improvements Provide storm drain connection and valve to sanitary sewer at fire station driveways <br />for vehicle washing <br />PIan/Policy Document: Wastewater BMP Manual <br />Total Project Cost: $500,000 <br />Hendricks Park Improvements Replace park maintenance building and implement. priority recommendations of the <br />Forest Management Plan, including invasive species removal, trail improvements, <br />signage, and planting of native species. <br />Plan/Policy Document Eugene Parks & Recreation Plan; Hendricks Park Forest <br />Management Plan <br />Total Project Cost: $700,000 <br />Ida Patterson Ballfields Develop parking area and Chambers Street entrance. <br />Plan/Policy Document Eugene Parks & Recreation Plan <br />Total Project Cost: $250,000 <br />Laurelwood Golf Course Maint. Shop Building Repair or replace Laurelwood Golf Course Maintenance Building due to age, <br />structural condition, and code problems. <br />Plan/Policy Document: Facility Condition Report <br />Total Project Cost: $500,000 <br />Park Restroom Facilities Provide accessible vandal-resistant restrooms at Amazon (2), Petersen, University, <br />Tugman, Graham, and Scobert. Remodel restrooms at Washingtonnefferson. <br />PIan/Policy Document: Eugene Parks & Recreation Plan <br />City of Eugene 2002-2007 Capital Improvement Program <br />38 <br />
The URL can be used to link to this page
Your browser does not support the video tag.