New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
FY 2002-07 Eugene CIP (2)
COE
>
PW
>
Admin
>
Execs
>
Executive non-confidential
>
Historical
>
FY 2002-07 Eugene CIP (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2009 8:02:40 AM
Creation date
6/1/2009 12:29:53 PM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Administration
PWA_Project_Area
Miscellaneous
PW_Subject
CIP
Document_Date
6/30/2007
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Building and Park Facilities <br />Secondary Building Systems Preserve and maintain interior building features, such as doors, walls, floors, ceilings <br />and all related finishes. <br />Plan/Policy Document: Facility Condition Report <br />Total Project Cost: $618,000 <br />Site Renovations & Rehabilitation Preserve and maintain special site-specific features, such as recreational facility <br />parking lots and drives, irrigation systems, drainage systems, outdoor lighting <br />systems, park furnishings & equipment, and path rehabilitation. <br />Plan/Policy Document: Parks & Recreation Plan <br />Total Project Cost: $2,286,000 <br />Site and Facility Improvements <br />ADA Renovations Improve and maintain access to City facilities for people with disabilities. Addresses <br />Federal, the Uniform Building Code and City-wide Facilities Accessibility Study. <br />Examples include implementation of ADA requirements at City Facilities. <br />Plan/Policy Document: ADAAG Facilities Accessibility Eva-uation, ADA <br />Transition Plan, Uniform Building Code <br />Total Project Cost: $1,259,000 <br />Atrium Building Improvements Various upgrades and improvements for recently purchased building. May include <br />improvements to HVAC, energy upgrades, roof and potential tenent improvements. <br />Plan/Policy Document: Facilities Building Audit. <br />Total Project Cost: $995,000 <br />General Site & Facility Improvements Modify and/or add to existing facilities to meet operational, safety and cost~fficiency <br />goals. Primary goal is to address changing program functions/needsavd/or to <br />improve service delivery. Dces not include acquisition or construction of new sites. <br />PIan/Policy Document: Various department and division plan/policy documents, <br />City Council goals and objectives. <br />Total Project Cost $1,725,000 <br />Library Parking Improvements Install new revenue control, gates, and signs. <br />Plan/Policy Document: <br />Total Project Cost: $35,000 <br />Lot #15 Revenue Controls Install new revenue controls at lot #15. <br />Plan/Policy Document: <br />Total Project Cost: $20,000 <br />City of Eugene 2002-2007 Capital Improvement Program <br />34 <br />
The URL can be used to link to this page
Your browser does not support the video tag.