Building and Park Facilities <br />tThese totals are not fund-specific and include all programmed funds. For information about specific funds and detailed project funding for <br />FY2002 and FY2003 , refer to the Two Year fund Detail on the previous page(s). <br />Description of Funded Projects <br />Preservation/Maintenance <br />Broadway Place Garage Preservation Repair cracks in deck; paint interior. <br />Plan/Policy Document: Parking Structure Condition Analysis (PSCA) <br />Total Project Cost: $65,000 <br />Building Service Systems Preserve and maintain building service systems, including elevators, mechanical <br />systems (plumbing, heating, cooling)needed to maintain reasonable service levels. <br />Program includes electrical systems necessary for lighting, equipment and computers. <br />Plan/Policy Document: Facility Condition Report, Uniform Building Code <br />Total Project Cost: $2,674,000 <br />EPAC Garage Repair .Repair cracks and repaint. <br />Plan/Policy Document: Parking Structure Condition Analysis (PSCA) <br />Total Project Cost: $15,000 <br />EPAC Garage Stair Repair Repair and seal stairs. <br />Plan/Policy Document: Parking Structure Condition Analysis (PSCA) <br />Total Project Cost: $8,000 <br />EPAC Garage Waterproofing Replace waterproofing membrane at first and fifth levels; clean and seal all decks and <br />walls. <br />Plan/Policy Document: Parking Structure Condition Analysis (PSCA) <br />Total Project Cost: $492,000 <br />Health, Safety & Welfare Preserve and maintain the health, safety and welfare of users of City facilities, <br />including asbestos abatement, air quality and building safety programs designed to <br />protect the public and employees. <br />Plan/Policy Document: Facility Condition Report, Uniform Building Code <br />Total Project Cost: $1,367,000 <br />City of Eugene 2002-2007 Capital Improvement Program <br />32 <br />