Airport <br />General Aviation Terminal Construct a new general aviation terminal on the east side of Green Hill Road. <br />Plan/Policy Document: Airport Master Plan Update, FAA & State 5 Year Plan <br />Total Project Cost $375,000 • ,•> <br />i <br />Parallel Runway Engineering & Design Engineer and design a new parallel runway and taxiway. Includes obtaining required <br />permits. <br />Plan/Policy Document: Airport Master Plan Update, FAA & State 5 Year Plan <br />~~ <br />Total Project Cost: $853,000 <br />F/ } <br />1~ <br />'/ <br />i <br />('~ <br />i 1~ <br />~~~:.~~. <br />~..~\ <br />7 <br />r: \ <br />~'~ <br />~\ <br />I.._ , <br />i <br />l..., <br />' •. <br />