.Airport <br />Table of Funded Projects <br />(Figures in $1000's) <br />Preservation/Maintenance <br />~ 2002 2003 , 2004 2005 2006 2007 I Total <br />Boeing Drive Overlay 39 ' $39 <br />Ramp Pavement Rehabilitation 335 388 ~ $723 <br /> 335 427 ~ $762 i <br />Site and Facility Improvements <br />Airport Auto Parking Expansion <br />Airport Circulation Road Improvements <br />Airport Land Acquisition <br />Airport Master Plan Update <br />Construct Taxiway Kilo <br />Rehabilitate Taxiways F/A6 <br />Relocate Car Rental Service Area <br />Rental Car Parking Expansion <br />Runway 3/21 Closure <br />New Capital Facilities <br />Acquire ARFF Equipment <br />Acquire SRE Equipment <br />Construct Exit Taxiway A-4 <br />Construct Parallel Runway <br />General Aviation Terminal <br />Parallel Runway Engineering & Design <br />tTotal <br />320 353 ~ $673 <br />~ 5118 2579 $7,697 <br />100 ; ~ ~ $100 <br /> 250 $250 <br /> 13 79; $1,379 <br />84~ ~ $84 <br />147 $147 <br /> 93 $93 <br /> 431 $431 <br />651 5118 353 1379; 3010 343 $10,854 <br />'. j 615 $615 <br /> 184 196 $380 <br />~ 200 $200 <br />j 10776 6860 1500 $19,136 ~ <br /> 375 $375 <br />273 580 ~ ! ~ $853 <br />2731 580 107761 1374 6860 1 1696 $21,559 <br />1259 6125 11129 2753 9870 2039 $33,175 <br />tThese totals are not fund-specific and include all programmed funds. For information about specific funds and detailed project funding for <br />FY2002 and FY2003 ,refer to the Two Year Fund Detail on the previous page(s). <br />Description of Funded Projects <br />Preservation/Maintenance <br />Boeing Drive Overlay Construct a 2 inch asphalt concrete overlay to preserve Boeing Drive. <br />Plan/Policy Document: Airport Capital Improvement Plan <br />Total Project Cost: $39,000 <br />City of Eugene 2002-2007 Capital Improvement Program <br />18 <br />