LANE COUNTY PUBLIC WORKS CAPITAL IMPROVEMENT PROGRAM <br /> Marcola Road, MP 11.49-16.08 ~©~d 1900-00 <br /> Wendling Road to Johnson Road CU[~: 11.49 2c~ 16.08 <br /> 1=;r~j~ci 1900-1 F{~: Rural Major Collector (FAS) <br /> t;~tegory: GENERAL CONSTRUCTION <br /> Scc~rru: Widen and overlay. <br /> ~l€s'cisit;afi:~r: High speeds and heavy truck traffic necessitate a need to widen the existing 24 foot pavement and add <br /> shoulders to meet current standards. The roadway was overlaid with 2 inches of asphalt in 1988, with an <br /> additional 2 inches planned for this project when shoulders are added. Project will complete needed <br /> pavement structure. This project also includes work to Cash Creek Bridge. The timber piling and caps are <br /> decayed and require replacement. Helper bents have been installed by County Forces to assist the decayed <br /> members. <br /> 'Y 2006 <br /> ~~s~: 2,700,000 <br /> pit zs~r`: 270,000 <br /> '[~~_1..~~ : 2,970,000 <br /> . ' i`:i~i~~"("iglu Shi~7~~-'F C3ti'i"~ tZ~tit~q <br /> T"~.~ ~w3ricl~2 ~>~~er:~irc€~;Et€~~; Substr~~€c~ure ~fi~i ~~r~c@~~ ?~;~sarStail~ z;R ~€~?~Jt~;~ <br /> - ' 16S 1 W 05B 14636A PCN WCNCP 30 46 1964 86 8 / 6 <br /> McVay Highway Realignment <br /> Bloomberg Road to 30th Avenue <br /> f'€"t;j~c;~ 1735-1 <br /> {~~t~:~c~i-~: GENERAL CONSTRUCTION <br /> Construct connector road between Bloomberg Road and 30th Avenue. <br /> .s.:t.isic~~icn: TransPlan project #297 -Traffic conditions on McVay Highway during Lane Community College peak hour <br /> commuter arrivals make traffic operations, in general, difficult for the area. <br /> 't 2004 <br /> ~LSSi: 500,000 <br /> I <br /> ~1z~;`: 300, 000 <br /> i F:: 800,000 <br /> Mill Road Realignment ~c~~d 6102-00 <br /> Hwy ss to WheelerRoad 0.00 to 0.249 <br /> F~roje~;9: 6102-1 F"{;: Rural Local <br /> :~~ie~r}r~: GENERAL CONSTRUCTION <br /> Fc;~~e: Realignment <br /> ' i.t:x~ific~z9.icr"r: CaPP Project -The existing intersection is too close. to railroad overcrossing. Observed safety problems <br /> with eastbound traffic on Hwy 58 stopping for left turns onto Mill Road. <br /> ~=`l 2004 <br /> ~c~st: 350,000 <br /> e~hs~': 35,000 <br /> i {~~"1~a 385,000 <br /> Milliron Road East ~r~~c~ 3450-00 <br /> Hwy 99 to Prairie Road ~<7 p': 0.00 t0 0.402 <br /> " f'r~;;~:ct 3450-1 FC~: Rural Local <br /> ~ - ' C<~i~~€~r~: GENERAL CONSTRUCTION <br /> ~~;rs~f~: Widen and overlay. <br /> ::€sii~ie~i:~ra: This project is being programmed in response to a request from the Oregon Department of Corrections in <br /> connection with a new prison to be constructed on this road. The ODC has indicated that, at least a portion, <br /> of this project may be reimbursed by the department. <br /> F=Y 2005 <br /> C.;r;~t: 850,000 <br /> ~ ICJ: 80,000 <br /> `l"~.~"1 ~:L.: 930,000 <br /> <br /> i, <br /> 35 <br /> _ _ _ _ <br /> <br />