Wastewater <br /> <br /> ' Table of Funded Projects <br /> (Figures in $1000's) <br /> 2002 200.3_ 2004 2005 2006 2007 Totai <br /> Preservation/Maintenance <br /> Wastewater System Rehabilitation 2000 2000 2000 2000 2000 2000 $12,000 <br /> 2000 2000 2000 2000 2000 2000 $12,000 <br /> New Capital Facilities <br /> Legacy Interceptor South 2759 $2,759 <br /> Link Drive Wastewater Pump Station 774 $774 <br /> Wastewater Services for New Development 115 115 115 115 115 115 $690 <br /> 115 115 2874 889 115 115 $4,223 <br /> tTotal 2115 2115 4874 2889 2115 2115 $16,223 <br /> tThese totals are not fund-specific and include all programmed funds. For information about specific funds and detailed project funding for <br /> FY2002 and FY2003 , refer to the Two Year Fund Detail on the previous page(s). <br /> Description of Funded Projects <br /> Preservation/Maintenance <br /> Wastewater System Rehabilitation Preserve and rehabilitate an aging wastewater system; decrease inflow and <br /> infiltration and address increased wet weather flows. <br /> _ PlanlPolicy Document: Sanitary Sewer Master Plan, Infiltration-inflow Program <br /> Total Project CosL• $12,000,000 <br /> ' - New Capital Facilities <br /> Legacy Interceptor South 48" Interceptor from Avalon Street (2000 feet north of Royal) to RooseveltlTerry <br /> ~ intersection. <br /> PtanlPolicy Document Urban Sanitary Sewer Master Plan, 1992 <br /> . Total Project Cost $2,759,000 <br /> ~ <br /> j'': Link Drive Wastewater Pump Station Construct Link Drive pump station between Awbrey Lane and Enid Road, Highway <br /> 99 and Prairie Road. <br /> , <br /> - PIan/Poficy Document Urban Sanitary Sewer Master Plan, 1992 <br /> r... <br /> Total Project Cost $774,000 <br /> t ~ <br /> City of Eugene 2002-2007 Capital Improvement Program <br /> 78 <br /> "s <br /> ('`r <br /> <br />