New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
FY 2002-07 Eugene CIP
COE
>
PW
>
Admin
>
Execs
>
Executive non-confidential
>
Historical
>
FY 2002-07 Eugene CIP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/8/2009 12:10:03 PM
Creation date
6/1/2009 12:29:23 PM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Administration
PWA_Project_Area
Miscellaneous
PW_Subject
CIP
Document_Date
6/30/2007
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
i <br /> Transportation <br /> Description of Unfunded Projects <br /> <br /> j Game Farm Road North Upgrade and capacity enhancement from Coburg Rd. to I-5. Two or three lane urban <br /> facility. <br /> Plan/Policy Document: Trans/Plan <br /> Total Project Cost: $2,150,000 ' <br /> j <br /> j Gilliam Road Upgrade and capacity enhancements -upgrade to two lane urban facility from the <br /> northern most new collector to Ayres Road. <br /> PIan/Policy Document: TranslPlan <br /> Total Project Cost: $690,000 <br /> Jeppesen Acres Road Upgrade and capacity enhancement to 2-lane urban facility from Gilliam Road to <br /> Providence Street <br /> Plan/Policy Document: Trans/Plan <br /> Total Project Cost: $525,000 <br /> Maple Street (Roosevelt -Elmira) Upgrade to a 2 lane urban facility. <br /> `1 <br /> PIan/Policy Document: TransPlan, Bethel-Danebo Refinement Plan <br /> Total Project Cost $210,000 <br /> Neighborhood Traffic Calming Neighborhood traffic calming projects, including speed humps, diverters, chokers, <br /> circles, and other street enhancements. Program addresses neighborhood traffic <br /> problems which are prioritized with the assistance of neighborhood organizations. - <br /> Thisfigure represents the unfunded need for the six-year CIP period. <br /> PIan/Policy Document: Trans/Plan <br /> Total Project Cost: $520,000 <br /> Priority Sidewalk Installation Projects Install new sidewalks based on the sidewalk priority rating system in the adopted <br /> City of Eugene Sidewalk Program. This figure represents the unfunded need for the <br /> six-year CIP period. <br /> Plan/Policy Document: TransPlan Policy, TRIP, City Sidewalk Program <br /> Total Project Cost: $2,300,000 <br /> Railroad Crossing Update Program Replace deteriorated railroad crossings with high quality new materials to improve <br /> the road surface <br /> PIan/Policy Document: Trans/Plan <br /> Total Project Cost: $300,000 <br /> Sidewalk Access Ramps Install sidewalk access ramps at intersection corners and other needed access <br /> locations throughout the City, including the installation of new ramps and ` <br /> reconstruction of existing ramps to comply with ADA and City standards. This figure <br /> represents the unfunded need for the six-year CIP period. <br /> Plan/Policy Document: Trans/Plan Policy, ADA Regulations <br /> Total Project Cost: $260,000 <br /> City of Eugene 2002-2007 Capital Improvement Program <br /> 68 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.