Transportation <br /> - Old Coburg Road -Chad Drive Extension The existing Otd Coburg Road is 24' wide pavement with existing ditches on both <br /> sides. The existing Chad Drive has curbside walk on the southside, two bike lanes, <br /> two-way traffic with middle turn pocket. There is approximately 250 LF on Chad <br /> Drive that will need new construction to connect with Old Coburg Road. <br /> Plan/Policy Document: Trans Plan <br /> Total Project Cost: $ 706,000 <br /> -.Royal Avenue- Terry to Greenhill Upgrade RoyaLAvenue between Terry Street and Greenhill Road to 3-lane urban <br /> facility. <br /> Plan/Policy Document: TransPlan, Royal Avenue Specific Plan, Eugene <br /> Arterial/Collector Street Plan <br /> Total Project Cost: $2,200,000 <br /> <br /> " ~ Sidewalk Access Ramps Install sidewalk access ramps at intersection corners and other needed access <br /> locations throughout the Ciry, including the installation of new ramps and <br /> reconstruction of existing ramps to comply with ADA and City standards. <br /> Ptan/Policy Document: Trans/Plan Policy, ADA Regulations <br /> ' Total Project Cost: $40,000 <br /> STP Funds Federal Surface Transportation Program (STP) funding allocated to Eugene for various <br /> projects. These funds are available for improvements on major streets (arterials and <br /> collectors) as well as off-street bicycle path construction. <br /> Plan/Policy Document: TransPlan <br /> Total Project Cost: $660,000 <br /> Street Lighting (Arterials & Collectors) Install new or upgraded street lights along major streets based on priority needs. <br /> Ptan/Policy Document: Trans Plan <br /> Total Project Cost: $310,000 <br /> Street Lighting (Residentiap Install new or upgraded street lights along focal streets and in residential areas. <br /> Locations are based on a priority system that incorporates crime activity, lighting <br /> needs, location and availability of power. <br /> ` - ' Plan/Policy Document: Street Lighting Priority List, Trans/Plan <br /> Total Project Cost: $60,000 <br /> i ~ <br /> ' Street Tree Stocking & Planting Program Plant street trees in City areas needing new trees and where street trees were <br /> removed due to damage or disease. <br /> PIan/Policy Document: Trans/Plan Policy, Street Tree Program, Urban Forest <br /> Management Plan <br /> - Total Project Cost: $60,000 <br /> City of Eugene 2002-2007 Capital Improvement Program <br /> 63 <br /> _ _ <br /> <br />