New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
FY 2002-07 Eugene CIP
COE
>
PW
>
Admin
>
Execs
>
Executive non-confidential
>
Historical
>
FY 2002-07 Eugene CIP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/8/2009 12:10:03 PM
Creation date
6/1/2009 12:29:23 PM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Administration
PWA_Project_Area
Miscellaneous
PW_Subject
CIP
Document_Date
6/30/2007
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Transportation <br /> - Old Coburg Road -Chad Drive Extension The existing Otd Coburg Road is 24' wide pavement with existing ditches on both <br /> sides. The existing Chad Drive has curbside walk on the southside, two bike lanes, <br /> two-way traffic with middle turn pocket. There is approximately 250 LF on Chad <br /> Drive that will need new construction to connect with Old Coburg Road. <br /> Plan/Policy Document: Trans Plan <br /> Total Project Cost: $ 706,000 <br /> -.Royal Avenue- Terry to Greenhill Upgrade RoyaLAvenue between Terry Street and Greenhill Road to 3-lane urban <br /> facility. <br /> Plan/Policy Document: TransPlan, Royal Avenue Specific Plan, Eugene <br /> Arterial/Collector Street Plan <br /> Total Project Cost: $2,200,000 <br /> <br /> " ~ Sidewalk Access Ramps Install sidewalk access ramps at intersection corners and other needed access <br /> locations throughout the Ciry, including the installation of new ramps and <br /> reconstruction of existing ramps to comply with ADA and City standards. <br /> Ptan/Policy Document: Trans/Plan Policy, ADA Regulations <br /> ' Total Project Cost: $40,000 <br /> STP Funds Federal Surface Transportation Program (STP) funding allocated to Eugene for various <br /> projects. These funds are available for improvements on major streets (arterials and <br /> collectors) as well as off-street bicycle path construction. <br /> Plan/Policy Document: TransPlan <br /> Total Project Cost: $660,000 <br /> Street Lighting (Arterials & Collectors) Install new or upgraded street lights along major streets based on priority needs. <br /> Ptan/Policy Document: Trans Plan <br /> Total Project Cost: $310,000 <br /> Street Lighting (Residentiap Install new or upgraded street lights along focal streets and in residential areas. <br /> Locations are based on a priority system that incorporates crime activity, lighting <br /> needs, location and availability of power. <br /> ` - ' Plan/Policy Document: Street Lighting Priority List, Trans/Plan <br /> Total Project Cost: $60,000 <br /> i ~ <br /> ' Street Tree Stocking & Planting Program Plant street trees in City areas needing new trees and where street trees were <br /> removed due to damage or disease. <br /> PIan/Policy Document: Trans/Plan Policy, Street Tree Program, Urban Forest <br /> Management Plan <br /> - Total Project Cost: $60,000 <br /> City of Eugene 2002-2007 Capital Improvement Program <br /> 63 <br /> _ _ <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.