New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
FY 2002-07 Eugene CIP
COE
>
PW
>
Admin
>
Execs
>
Executive non-confidential
>
Historical
>
FY 2002-07 Eugene CIP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/8/2009 12:10:03 PM
Creation date
6/1/2009 12:29:23 PM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Administration
PWA_Project_Area
Miscellaneous
PW_Subject
CIP
Document_Date
6/30/2007
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> ~ ~ J <br /> Sfiormwafier <br /> <br /> ~~1 <br /> The City's stormwater capital program reflects the goals of the 1993 Comprehensive <br /> Stormwater Management Plan (CSWMP) and the City's compliance with the National Pollutant <br /> Discharge Elimination System {NPDES) stormwater permit. <br /> The goals of the capital improvements include the following: <br /> 1. Protect the community from excessive flood damage. <br /> 2 Meet the requirements. of the Clean Water Act for managing non-point source <br /> pollution. <br /> 3. Participate in the on-going management and implementation of the West Eugene• <br /> ' ~ Wetlands Plan and associated wetland bank program. <br /> 4. Preserve the effectiveness of the stormwater system through an ongoing operations and <br /> maintenance program. <br /> 5. .Incorporate the multiple objectives outlined in CSWMP into capital projects; flood <br /> protection and related water quality and natural resource protection. <br /> As a result of the City Council's adoption of CSWMP and DEQ's issuance of the National <br /> Pollutant Discharge Elimination System (NPDES) stormwater quality permit, the City is revising <br /> its Stormwater Master Plan to meet the multiple goals mentioned above. The six-year C1P <br /> ~ reflects priority projects that have emerged from an 18-month process involving a <br /> departmental advisory committee (DAC) or have been identified as deficiencies in the system. <br /> ~ ~ Project Categories <br /> Stormwater projects are described in one of four ways: <br /> 1. Preservation and Maintenance -This category includes two, multi-faceted project.. <br /> ~ ~ <br /> types: <br /> t <br /> . Stormwater Rehabilitation/improvements -These projects preserves the investment <br /> in existing stormwater system, rehabilitate existing open waterways, outfalls and <br /> tip-ups, and address localized system improvements. <br /> - Channel Easement Acquisition -These projects address real property easement <br /> acquisitions for priority stream corridors, maintenance access needs, or acquisitions <br /> ~ ` that may be associated with development proposals. <br /> . <br /> City of Eugene 2002-2007 Capital Improvement Program <br /> Page 45 <br /> , <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.