Transportation <br /> ` Sidewalk Access Ramps Install sidewalk access ramps at intersection corners and other needed access <br /> ` locations throughout the City, including the installation of new ramps and <br /> reconstruction of existing ramps to comply with ADA and City standards. <br /> i n P lic Document: TransPlan Poli ADA Re ulations <br /> Pla / o y cy, g <br /> Total Project Cost: $180,000 <br /> i <br /> Stree#`l.ighting (Arterials & Install new or upgraded street lights along arterial and collector streets based on <br /> Collectors) priority needs. <br /> Plan/Policy Document: TransPlan <br /> Total Project Cost: $360,000 <br /> j <br /> i <br /> Street Lighting (Residentiap Install new or upgraded street lights along local streets and in residential areas. <br /> Locations are based on a priority system that incorporates crime activity, lighting <br /> needs, location and availability of power. <br /> Plan/Policy Document: Street Lighting Priority List, TransPlan <br /> ~I ; Total Project Cost: $180,000 <br /> Street Tree Stocking & Planting Plant street trees in City areas needing new trees and where street trees were <br /> Program removed due to damage or disease. <br /> Plan/Policy Document: TransPlan Policy, Street Tree Program, Urban Forest <br /> Management Plan <br /> Total Project Cost: $180,000 <br /> Traffic Operations Safety and transportation system management improvements, including adding <br /> Improvement Program turn lanes and bicycle lanes, median islands, safety devices, and other restriping <br /> and channelization modifications. <br /> Plan/Policy Document: TransPlan Policy <br /> <br /> ` , <br /> Total Project Cost: $330,000 <br /> Traffic Signal Improvements Install new traffic signals and upgrade the traffic signal system to improve <br /> and Upgrades responsiveness, reduce delay, improve air quality, and facilitate multi-modal <br /> traffic flow. Locations for installing new traffic signals are based on a priority <br /> ' v lum d la s accidents standard si nal <br /> ratin s stem that considers traffic o es e <br /> g Y ~ Y. ~ g <br /> warrants and other traffic and development-dependent factors. <br /> - Plan/Policy Document: Traffic Signal Priority List, TransPlan <br /> ` Total Project Cost: $900,000 <br /> .City of Eugene 20042009 Capital Improvement Program <br /> 98 <br /> _ _ _ _ <br /> <br />