New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
FY 2004-09 Eugene CIP
COE
>
PW
>
Admin
>
Execs
>
Executive non-confidential
>
Historical
>
FY 2004-09 Eugene CIP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/8/2009 12:11:35 PM
Creation date
6/1/2009 12:29:08 PM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Administration
PWA_Project_Area
Miscellaneous
PW_Subject
CIP
Document_Date
6/30/2009
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
124
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Stormwater <br /> 1;~_; <br /> Stormwater Rehabilitation/Improvements <br /> Ayres Pond Outfall Retrofit Install a stormwater quality structure upstream of the outfall to Ayres Pond to <br /> remove large debris from the inaccessible lower portions of the open channel. <br /> Retrofit the existing outfal I structure with a larger concrete pad and energy <br /> dissipaters. Design in FY06. Construction in FY08 & FY09. <br /> Plan/Policy Document: CSWMP; Stormwater Basin Plans, Stream Corridor <br /> Acquisition Study <br /> ilf <br /> Total Project Cost: $774,000 <br /> i <br /> j ' General Stormwater Rehabilitate, reconstruct and install stormwater system where needed due to <br /> Rehabilitation age, poor materials, localized flooding, and/or systems limitations. Where <br /> feasible, natural systems are used to address existing problems in conformance <br /> <br /> I with CSWMP. <br /> <br /> i <br /> Plan/Policy Document: Public Facilities Plan & Services; Comprehensive <br /> Stormwater Management Plan; Stormwater Basin Plans <br /> Total Project Cost: $1,500,000 <br /> Outfall Stabilization Retrofit storm drainage system outfalls which are creating bank stability <br /> problems along the Amazon Creek and the Willamette River within the City of <br /> Eugene. <br /> Plan/Policy Document: CSWMP; Stormwater Basin Plans <br /> Total Project Cost: $500,000 <br /> Retrofit Empire Park Pond Construct a 2 ac-ft sediment forebay for stormwater discharges into the pond <br /> and enhance the natural resources of the existing pond area (approximately 2.1 <br /> acres) through sediment removal and revegetation. Design in FY07. <br /> Construction after FY09. <br /> Plan/Policy Document: CSWMP; Stormwater Basin Plans <br /> ' Total Project Cost: $57,000 <br /> Streambank Stabilization Implement streambank stabilization projects to help streams adjust to increased <br /> runoff volumes while limiting negative impacts associated with downcutting, <br /> sedimentation, and erosion. Where appropriate, use bioengineering techniques <br /> to stabilize streambanks. <br /> Plan/Policy Document: CSWMP; Stormwater Basin Plans <br /> Total Project Cost: $700,000 <br /> i <br /> City of Eugene 20042009. Capital. Improvement Program <br /> 83 <br /> _ . <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.