Stormwater <br /> 1;~_; <br /> Stormwater Rehabilitation/Improvements <br /> Ayres Pond Outfall Retrofit Install a stormwater quality structure upstream of the outfall to Ayres Pond to <br /> remove large debris from the inaccessible lower portions of the open channel. <br /> Retrofit the existing outfal I structure with a larger concrete pad and energy <br /> dissipaters. Design in FY06. Construction in FY08 & FY09. <br /> Plan/Policy Document: CSWMP; Stormwater Basin Plans, Stream Corridor <br /> Acquisition Study <br /> ilf <br /> Total Project Cost: $774,000 <br /> i <br /> j ' General Stormwater Rehabilitate, reconstruct and install stormwater system where needed due to <br /> Rehabilitation age, poor materials, localized flooding, and/or systems limitations. Where <br /> feasible, natural systems are used to address existing problems in conformance <br /> <br /> I with CSWMP. <br /> <br /> i <br /> Plan/Policy Document: Public Facilities Plan & Services; Comprehensive <br /> Stormwater Management Plan; Stormwater Basin Plans <br /> Total Project Cost: $1,500,000 <br /> Outfall Stabilization Retrofit storm drainage system outfalls which are creating bank stability <br /> problems along the Amazon Creek and the Willamette River within the City of <br /> Eugene. <br /> Plan/Policy Document: CSWMP; Stormwater Basin Plans <br /> Total Project Cost: $500,000 <br /> Retrofit Empire Park Pond Construct a 2 ac-ft sediment forebay for stormwater discharges into the pond <br /> and enhance the natural resources of the existing pond area (approximately 2.1 <br /> acres) through sediment removal and revegetation. Design in FY07. <br /> Construction after FY09. <br /> Plan/Policy Document: CSWMP; Stormwater Basin Plans <br /> ' Total Project Cost: $57,000 <br /> Streambank Stabilization Implement streambank stabilization projects to help streams adjust to increased <br /> runoff volumes while limiting negative impacts associated with downcutting, <br /> sedimentation, and erosion. Where appropriate, use bioengineering techniques <br /> to stabilize streambanks. <br /> Plan/Policy Document: CSWMP; Stormwater Basin Plans <br /> Total Project Cost: $700,000 <br /> i <br /> City of Eugene 20042009. Capital. Improvement Program <br /> 83 <br /> _ . <br /> <br />