New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
FY 2004-09 Eugene CIP
COE
>
PW
>
Admin
>
Execs
>
Executive non-confidential
>
Historical
>
FY 2004-09 Eugene CIP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/8/2009 12:11:35 PM
Creation date
6/1/2009 12:29:08 PM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Administration
PWA_Project_Area
Miscellaneous
PW_Subject
CIP
Document_Date
6/30/2009
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
124
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
~ ~ ~ <br /> Site-specific CIP projects shown in funding <br /> _ ! tables for 2004-2009 as $50,000 or more <br /> 1 Access Road Improvements and Signage ~ Rental Car Parking Expansion <br /> 1 Aircraft Wash Station - ~ Repave Douglas Drive <br /> Airfield Equipment Storage ~ ~ Replace Airfield Signs <br /> Airport Entrance Road Runway 3/21 Closure <br /> i Auto Parking Expansion ~ ~ Service Roads <br /> ° Circulation Road Improvements l Stairway Enclosure -North Side <br /> 1 Construct Taxiway Kilo Taxilane -Development Area #2, Phase 2 <br /> ~ ° ~ Expand Air Cargo Ramp 'Terminal Building Expansion <br /> ° Fiber Optic Line to Airport Upgrade Taxiway Charlie <br /> d Flight Information Display System Upgrade ~ Wetlands Delineation/Mitigation <br /> (Gate Upgrades-Gates 60 and 100/110 ~ ~ ,Construct Exit Taxiway Alpha-4 <br /> ~ Install Street Lights on Airport Road and Northrup ~ ~ Construct Parallel Runway <br /> g ~ Overlay of Runway 34/16 General Aviation Terminal <br /> <br /> - Site-specific major CIP projects previously funded <br /> but not currently constructed <br /> ~ Relocate Car Rental Area <br /> Terminallmprovements <br /> Taxi Lane Modification <br /> North Ramp Rehabilitation <br /> ~ ' Taxiway F-A/6 Rehabilitation <br /> r_ , <br /> Parallel Runway Engineering and Design <br /> Security Measures (Access Control Upgrade) <br /> c. <br /> Deicing Collection System <br /> Parking Lot Equipment and Post 9-11 Improvements <br /> • Land Acquisition <br /> Airport Terminal Building Carpet <br /> ' In order to be able to clearly identify proposed projects, the <br /> ~ previously approved projects have not been identified on the map. <br /> Figure 1 b <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.