Transportation -Unfunded Program (Cont.) <br />Description of Unfunded Projects <br />Preservation/Maintenance <br />"'. <br />Bike Path Rehabilitation Preserve and maintain existing 25 miles of bike paths. <br />Plan/Policy Document: !, . <br />Total Project Cost: $390,000 <br />Street & Alley Preservation Preserve existing improved streets and alleys City-wide, including overlays and minor <br />reconstruction projects for roadways deteriorated to a point where operating resources <br />for preventative maintenance are not cost-effective. <br />Plan/Policy Document: TransPlan Polity, Pavement Management Program; `~ <br />Total Project Cost: $10,440,000 <br />System Preservation & Maintenance Preserve and maintain the investment in existing improved streets, alleys, traffic <br />controls and other transportation facilities City-wide, including overlays and minor <br />reconstruction projects for roadways deteriorated to a point where operating resources <br />for preventative maintenance are not cost-effective. <br />Plan/Policy Document: TransPlan Policy, Pavement Management System, Eugene <br />Infrastructure Finance Study <br />Total Project Cost: $10,600,000 <br />URgrades and Ca aci Enhancement <br />18th Avenue (Bailey Hill -Polk) Widen to 5 lanes, including bike lanes, sidewalks and street lighting. <br />Plan/Policy Document: TransPlan <br />Total Project Cost: $3,270,000 <br />22nd Avenue (Henderson -Glenwood) Upgrade to a 2-lane urban facility. <br />Plan/Policy Document: Glenwood Refinement Plan <br />Total Project Cost: $265,000 <br />28th/29th Avenues (Madison -Willamette) Remove parking and restripe to 3 lanes, including bike lanes, from Madison to Lincoln. <br />Widen to 5 lanes, including bike lanes, from Lincoln to Willamette. Consider installing ?: <br />sidewalks along missing portions of the facility. , '; <br />Plan/Policy Document: TransPlan <br />Total Project Cost: $805,000 <br />30th Avenue (Onyx -Alder) Widen 30th Avenue on the north side to accommodate an additional travel and bike <br />lane. Infill north sidewalk to provide continuous sidewalk in this area. <br />Plan/Policy Document: TransPlan <br />Total Project Cost: $356,000 <br />Agate Street (30th -Black Oak) Upgrade to a 2-lane urban facility. <br />Plan/Policy Document: TransPlan <br />Total Project Cost: $440,000 <br />City of Eugene • 199&2003 Capital Improvement Program <br />Project and Program Areas -Transportation <br />55 <br />