New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
FY 1998-2003 Eugene CIP
COE
>
PW
>
Admin
>
Execs
>
Executive non-confidential
>
Historical
>
FY 1998-2003 Eugene CIP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2009 7:59:51 AM
Creation date
6/1/2009 12:28:59 PM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Administration
PWA_Project_Area
Miscellaneous
PW_Subject
CIP
Document_Date
6/30/2003
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
128
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Airport -Six-Year Funded Program- (Cont.) <br />Site and Facility Improvements <br />Airport Access Improvement Modify and improve Airport Road, Greenhill Road, and the airport entrance and exit <br />roadways. <br />Plan/Policy Document: Airport Master Plan, FAA & State 5 Year Plan <br />Total Project Cost: $496,000 <br />Auto Parking Expansion Expand auto parking (537 spaces) adjacent to the existing long-term lot. This project is <br />dependent on air traffic volumes and development. <br />Plan/Policy Document: Airport Master Plan, FAA & State 5 Year Plan <br />Total Project Cost: $561,000 <br />Employee Parking Expansion Expand employee parking (65 spaces).. <br />Plan/Policy Document: FAA, Airport Master Plan, State 5 Year Plan <br />Total Project Cost: $98,000 <br />Rehabilitate Taxiway Kilo Rehabilitate taxiway kilo. <br />Plan/Policy Document: <br />Total Project Cost: <br />Rehabilitate Taxiways (A/B/C/E) Rehabilitate taxiways A/E <br />Plan/Policy Document: <br />Total Project Cost: <br />Airport Master Plan, FAA & State 5 Year Plan <br />$1,033,000 <br />/UE, including 2-3 inches of asphalt overlay. <br />Airport Master Plan, FAA & State 5 Year Plan <br />$500,000 <br />Taxi Line Relocation Design and construct remote ground transportation site for taxi storage. <br />Plan/Policy Document: Public Works Workplan <br />Total Project Cost: $175,000 <br />New Capital Facilities <br />North Site Development Develop hangar and industrial space at the north end of the airport, including utilities. <br />Plan/Policy Document: FAA, State 5 Year Plan, Industrial Land Use Study <br />Total Project Cost: $100,000 <br />Parallel Runway Engineering & Design Engineer and design a new parallel runway. <br />Plan/Policy Document: Airport Master Plan, FAA & State 5 Year Plan, Approved <br />PFC Application <br />Total Project Cost: $750,000 <br />Parallel Runway Phase 1 (2001) Clear and grub for 6,000 foot runway. Pave and light 4,000 feet of runway and <br />turnarounds. Construct connector taxiway with lights. <br />Plan/Policy Document: Airport Master Plan, FAA & State 5 Year Pfan <br />Total Project Cost: $6,554,000 <br />City of Eugene • 1998-2003 Capital Improvement Program <br />Project and Program Areas- Airport <br />22 <br />
The URL can be used to link to this page
Your browser does not support the video tag.