New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
FY 1998-2003 Eugene CIP
COE
>
PW
>
Admin
>
Execs
>
Executive non-confidential
>
Historical
>
FY 1998-2003 Eugene CIP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2009 7:59:51 AM
Creation date
6/1/2009 12:28:59 PM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Administration
PWA_Project_Area
Miscellaneous
PW_Subject
CIP
Document_Date
6/30/2003
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
128
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Project and Program Areas <br />Introduction <br />This section is divided into five project and program areas covering the range of City capital <br />improvement projects: <br />• Airport <br />'' • Building and Park Facilities <br />• Stormwater <br />• Transportation <br />• Wastewater <br />Each area includes a general narrative of the key elements as well as overall needs and funding <br />issues, a list of specific projects and programs for Fiscal Years 1998 and 1999, and a list of <br />projects and programs that define the overall six-year CIP (Fiscal Years 1998-2003). <br />Each Table of Funded Projects is followed by descriptions of the individual projects. Each <br />project description contains aPlan/Policy Document list which provides the project <br />justification and/or origin. The list includes relevant policies, goals and other supportive <br />documents. Projects in each of the Six-Year Funded Programs have relatively secure funding <br />sources (or have a high probability of being funded). The actual six-year improvement <br />program is based only on these funded projects. <br />Information pertaining to total fund amounts and specific funding sources for Fiscal Years <br />1998 and 1999 of the CIP is located in the Two Year Fund Summary (see Pages 66-67). <br />Funded and Unfunded Projects <br />In cases.where there is a discrepancy between needs and available resources, projects are <br />separated into two distinct programs: the Six-Year Funded Program (as described above) and <br />an Unfunded Program. <br />Improvements which are needed during the six-year program period, but for which all or most <br />of the funding is uncertain, are considered unfunded projects. These are listed and described <br />,_, in the Unfunded sections of each applicable program area. Due to funding uncertainties, the <br />Table of Unfunded Projects for each area provides only preliminary budget planning costs for <br />the individual projects and does not indicate a planning year for construction. <br />City of Eugene .1998-2003 :Capital Improvement Program <br />Project and Program Areas <br />~8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.