New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
FY 1998-2003 Eugene CIP
COE
>
PW
>
Admin
>
Execs
>
Executive non-confidential
>
Historical
>
FY 1998-2003 Eugene CIP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2009 7:59:51 AM
Creation date
6/1/2009 12:28:59 PM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Administration
PWA_Project_Area
Miscellaneous
PW_Subject
CIP
Document_Date
6/30/2003
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
128
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
NEIGHBORHOOD NEEDS REQUESTS <br />1992-1996 <br />Neighborhood Year Capital Projects In IP as <br />Organization Requested guested Funded Comments <br />Active Bethel Citizens 1995 Build (non-specific) bike lanes, bridges or No Neighborhood should discuss <br />continued paths to connect parks to existing bike specific locations with City Bicycle <br /> paths. Need a way to cross Beltline. Coordinator for inclusion in the <br /> Bicycle Master Plan. <br /> 1995 Complete Beltline project with emphasis ** Barger-Beltline project to be <br /> on Barger. completed iri 1997. Second phase <br /> of Beltline to be programmed by <br /> ODOT. <br /> 1995 Widen jessen Street. Signalize jessen & * Widening will be evaluated as a <br /> Hwy 99. Add street lights on Mangan, potential local street assessment <br /> Noah and Cubit Streets (to include cul de project. Signal request will be <br /> sacs)., evaluated for potential funding <br /> under the TrafficSigna) Installation <br /> Program. Street light requests will <br /> be added to the last and prioritized. <br /> Highest priority tights to be installed <br /> during Fall-Winter 1996-1997, <br /> using Council-approved funding. <br /> Additional lights to be evaluated as <br /> part of Residential Street Light <br /> program.- <br /> 1.995 Upgrade Maple Street (Roosevelt -Elmira) No Included in CIP as an unfunded <br /> to City standards. project. <br />*These projects will be evaluated for funding in this CIP within existing program categories rather than as separate, stand-alone projects. <br />**These projects have been completed or are in progress as prior-year CIP projects, other agencies' projects, or operational improvements. <br />City of Eugene .1998-2003 Capital Improvement Program <br />Appendix <br />69 <br />
The URL can be used to link to this page
Your browser does not support the video tag.