New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
FY 2000-01 MWMC Budget
COE
>
PW
>
Admin
>
Execs
>
Executive non-confidential
>
Historical
>
FY 2000-01 MWMC Budget
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/8/2009 12:08:17 PM
Creation date
6/1/2009 12:28:47 PM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Wastewater
PWA_Project_Area
MWMC
PW_Subject
Budget
Document_Date
6/30/2001
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Metropolitan Wastewater Management Commission Budget Message <br /> 1 <br /> contributions to Capital Reserves will be $2,449,660 for the CIP and $499,999 for the Major <br /> Rehabilitation Program. These contributions are intended to build reserves sufficient to fund 5- <br /> year Capital Program needs. The proposed budget also maintains an operating. reserve, consistent <br /> with the Commission's policy, at an amount equal to 10% of the operating budget. The target <br /> for FY 00-01 is $830,304. <br /> II Budget Assumptions <br /> • Existing levels of service are funded. <br /> • Permit requirements are met: <br /> • New environmental challengers (e.g. ESA, CWA regulations), are monitored, planned for <br /> ~I and responded to, <br /> <br /> i~ • No changes in operational conditions or regulatory requirements are anticipated. <br /> • Proposed annual cost of living wage adjustments include an increase of 3% for Eugene and <br /> <br /> 'i 2.5% (union) and 2.5% {non-union) for Springfield personnel. <br /> • .Operational costs for start-up of the dewatering facility are included ($103,850). <br /> • Operational costs for start up of the dedicated land applicationproject are not included. <br /> • Working capital remains budgeted at $200,000 for Springfield, and $500,000 for Eugene. <br /> • Capital reserve contribution will be $2,949,659. <br /> • Equipment replacement reserve contribution will be $674,908. <br /> ~ <br /> • The Operating Reserve will be maintained at 10% of the Operating Budget in FY 00-01, <br /> which is consistent with_MWMC policy. <br /> • User rate revenues are projected at current rates for FY 00-O1 which are $ 1,881,381, <br /> • System Development Charge (SDC) revenues are projected at $1,085,000 FY 00-01, which <br /> in combination with user rate revenues total $12,308,000. <br /> i <br /> 4_ <br /> Page 2 FY 00-01 BUDGET <br /> _ _ <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.