New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
FY 2000-01 MWMC Budget
COE
>
PW
>
Admin
>
Execs
>
Executive non-confidential
>
Historical
>
FY 2000-01 MWMC Budget
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/8/2009 12:08:17 PM
Creation date
6/1/2009 12:28:47 PM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Wastewater
PWA_Project_Area
MWMC
PW_Subject
Budget
Document_Date
6/30/2001
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Metropolitan Wastewater Management Commission SIW Budget Detail <br /> 1 ~ SEASONAL INDUSTRIAL WASTE FACILITY <br /> ~ <br /> The SIW handles the seasonal wastewater treatment needs of food processing operations located in <br /> ~ the service area. Cannery wastewater is treated by spray irrigation onto 190 acres of land located at <br /> the northeast corner of Prairie Road and West Beacon Drive. The irrigated land is managed for <br /> agricultural crop production by a local farmer under contract with the MWMC. In FY2000 the site <br /> ' will be managed to produce a hay crop for nutrient removal. <br /> The SIW also utilizes an 80 million gallon lagoon for storage of cannery wastewater during the <br /> non-irrigation season. Under regulatory provisions, supernatant from this lagoon can be pumped to <br /> the WPCF if absolutely necessary to maintain proper storage capacity. <br /> i <br /> l Significant Changes For FY 00-01 <br /> ( • The proposed budget for the Seasonal Industrial Waste Facility totals $658,381. This budget <br /> ` ' represents an increase of $194,545 or 42%. <br /> f. <br /> • Clean out of the accumulated solids in the lagoons serving the Seasonal Industrial Waste Site. <br /> ~ • Evaluate transition of SIW facility from sole Chiquita use. <br /> Personnel Services <br /> ii <br /> I' <br /> J Personnel Services shows a budget increase of $25,079, a 10% increase. The major changes are in <br /> the following areas: <br /> `_I <br /> 3 • An increase of .16 FTE is being projected in the SIW budget for FY00-O1. During preparation <br /> of the annual budget proposal, the distribution of FTE hours for regional and non-regional <br /> activities from the previous year is reviewed. This year data from our Computerized <br /> ~ ` Maintenance Management System was used to better determine the actual time being spent in <br /> ' the different funding areas. Another impact this year is the reallocation of administrative <br /> support time to all the different funding sources. This adjustment reflects those changes. <br /> 7 • A cost of living increase of 3%. <br /> Materials and Services <br /> r~ <br /> 'j i _i Materials and Services shows a total FY 00-01 proposed budget increase of $169,466, which is an <br /> 84% increase. The major changes are in the following areas. <br /> <br /> 'I ~ <br /> • A one-time expenditure of $200,000 is being proposed for cleaning solids from the SIW <br /> ' lagoon. <br /> ~ <br /> I. <br /> • A reduction of $7,000 in utility costs is based on actual costs from energy usage in FY98-99. <br /> r~- <br /> Page 42 FY 00-01 BUDGET <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.