New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
FY 2000-01 MWMC Budget
COE
>
PW
>
Admin
>
Execs
>
Executive non-confidential
>
Historical
>
FY 2000-01 MWMC Budget
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/8/2009 12:08:17 PM
Creation date
6/1/2009 12:28:47 PM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Wastewater
PWA_Project_Area
MWMC
PW_Subject
Budget
Document_Date
6/30/2001
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
i <br /> Metropolitan Wastewater Management Commission Capital Improvement Program <br /> , <br /> Master Plan, and Regional Wastewater Program staff concluded that a comprehensive WWFMP <br /> is necessary to determine the most cost-effective, feasible peak flow management options. <br /> This project, formerly called a Sanitary Sewer Evaluation Study (SSES ,was included in the FY <br /> 97-98 and the 5-year CIP as a two-year study with an estimated cost of $500,000. In early 1998, <br /> MWMC authorized a consultant contract with CH2M Hill in the amount of $391,350. At the <br /> same time $150,000 in second year funding was appropriated from reserves in order to provide - <br /> the full budget appropriation to award the contract. The unspent portion of these funds at year- <br /> ' ~ ' end was carried over to FY 98-99 and the remaining project balance of $100,000 was budgeted in <br /> i FY 98-99. In FY 99-00, $193,396 was carried forward to continue to cover contract costs and <br /> complete the project. <br /> Staff and CH2M HILL will be taking the next few months to complete the WWFMP project and <br /> the Citizens Advisory Committee (CAC) process. The WWFMP recommendations will be <br /> forwarded to the Commission and City Councils for feedback and implementation. In order to <br /> implement the system improvements identified in the WWFMP follow up monitoring will be <br /> needed to further refine where specific infiltration and inflow (I/I) reduction will be targeted. In <br /> FY 00-O1, an additional appropriation of $650,000 is needed. Of this amount, $500,000 is a <br /> placeholder amount to be used for the installation of installation of two flow monitors for each <br /> major interceptor, technical assistance to determine the best flow monitoring technology, and <br /> ` " design of WWFMP system improvements; and $150,000 is for the upgrade of the Glenwood <br /> pump station. <br /> 1 <br /> <br /> I f-- <br /> <br /> I i <br /> t <br /> <br /> j i <br /> <br /> i <br /> <br /> j - <br /> 1... _ - <br /> i <br /> r , <br /> is <br /> <br /> I' <br /> 1 <br /> <br /> ~,I <br /> Page 26 FY 00-01 BUDGET <br /> 1~1 <br /> i <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.