New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
FY 2001-02 Regional Wastewater Program Budget
COE
>
PW
>
Admin
>
Execs
>
Executive non-confidential
>
Historical
>
FY 2001-02 Regional Wastewater Program Budget
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2009 8:05:40 AM
Creation date
6/1/2009 12:28:40 PM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Wastewater
PWA_Project_Area
MWMC
PW_Subject
Budget
Document_Date
6/30/2002
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
. <br />Metropolitan Wastewater Management Commission SIW Budget Detail <br />SEASONAL INDUSTRIAL WASTE FACILITY <br />The Seasonal Industrial Waste Facility (SINN) handles the seasonal wastewater treatment needs of <br />food processing operations located in the service area. Cannery wastewater is treated by spray <br />irrigation onto 190 acres of land located at the northeast corner of Prairie Road and West Beacon <br />Drive. The irrigated land is managed for agricultural crop production by a local farmer under <br />contract with the MWMC. In FY 01-02 the site will be managed to produce a hay crop for nutrient <br />removal. <br />The SIW also utilizes an 80 million gallon lagoon for storage of cannery wastewater during the <br />non-irrigation season. Under regulatory provisions, supernatant from this lagoon can be pumped <br />to the WPCF if absolutely necessary to maintain proper storage capacity. <br />Significant Changes For FY O1-02 <br />The proposed budget for the Seasonal Industrial Waste Facility totals $431,074. This budget <br />represents an decrease of $227,307 or 35%. <br />Elimination of a one-time expenditure of $200,000 from the FY 00-01 budget to clean out <br />the accumulated solids in the lagoons serving the Seasonal Industrial Waste Site. <br />• Continue to evaluate transition of SIW facility from sole Chiquita use. <br />Personnel Services <br />Personnel Services shows a budget decrease of $16,281, a 6% decrease. The major changes are <br />in the following areas: <br />A decrease of .57 FTE is being projected in the SIW budget for FY01-02. During <br />preparation of the annual budget proposal, the distribution of FTE hours for regional and <br />non-regional activities from the previous year is reviewed. This adjustment reflects those <br />changes. <br />• A cost of living increase of 3%. <br />Materials and Services <br />Materials and Services shows a reduction of $211,026, a 57% decrease. The major change is in <br />the following area. <br />• The $200,000 budgeted in FY 00-01 for cleaning solids from the SIW lagoon was a one- <br />time expenditure. <br />Page 43 FY Ol -02 Budget <br />
The URL can be used to link to this page
Your browser does not support the video tag.